Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Stormwater Management Plan

of 42

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 15, section 1. The text section number identifies this passage in the reader.

6.4.7 Reporting / Review

Records such as licences, approvals, permits and inspection reports must be reviewed on a regular basis
(e.g. at least monthly) to ensure that legal compliance is met, complaints are reviewed and systems are
working to prevent contamination.

6.4.8 Corrective Actions
•    Perform clean-up of any spills immediately.
•    Any mud or sediment which is tracked onto public roads is to be immediately removed using dry
     clean-up methods i.e. shovel and broom.
•    Remove or relocate any stockpiles of waste where there is a reasonable risk of erosion and
     sedimentation.
•    Replace or repair sediment or pollution control devices if they are not maintained in good working
     condition.




                                                                                                                                         15
Inspired engineering

22 May 2025
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/10000-10999/10200-10299/10256/Report/22-05-25 SWMP_Issue A.docx

Log in to download the original (Stormwater Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.