Provide rumble grates at exit points from the site for passing earthmoving vehicles.
Where possible maintain existing landscaping/grasses downslope from construction areas
to act as buffer/silt trap.
Install temporary downpipes from completed roof structures and ensure runoff passes
through silt fences.
Minimise concentrating surface flows.
Place silt barriers around council stormwater pits that the site drains to.
Cover soil stockpiles with hessian or similar.
5.3 Completed Development
We are proposing to use a combination of active and passive stormwater treatment measures. Active
measures will include a bio-retention basin and a water storage tank for re-use and passive measures via
gross pollutant inserts into stormwater pits within paved areas that receive runoff from areas prone to
gross pollutants.
5.3.1 Water Quality Objectives
Water quality objectives for South East Queensland are outlined in the State Planning Policy 2017 and
are displayed in Table 5.1. These reductions are achieved by adopting best practice techniques in
accordance with the abovementioned guidelines.
Table 5.1: Minimum Mean Annual Load Reductions
POLLUTANT / ISSUE MINIMAL MEAN ANNUAL LOAD REDUCTIONS
Total Suspended Solids (TSS) 80%
Total Phosphorous (TP) 60%
Total Nitrogen (TN) 45%
Gross Pollutants (GP) 90%
SCG Consulting Engineers Page 10 SCG Ref: 31131(SWMP).RevA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 31131(SWM).RevA.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.