4. ASSESSMENT MANAGER CONDITIONS
DEVELOPMENT PERMIT FOR OPERATIONAL WORK (ENGINEERING WORKS -
ROADWORKS, DRAINAGE WORKS, STORMWATER, EARTHWORKS AND WATER &
SEWERAGE INFRASTRUCTURE)
Conduct an Engineering Prestart Meeting
1. Prior to any works commencing, a pre-start meeting for engineering works must be
conducted.
(a) No works are to commence on site prior to fencing of the vegetation to be protected.
General
2. Written advice must be provided of the contractor's name and the proposed date of
commencement of construction. An onsite prestart meeting must be organised with
Council’s delegate giving five (5) working days advanced notice prior to the meeting being
conducted (refer to Advisory Notes)
3. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) competent in civil works and must be undertaken by a nominated principal
contractor experienced in the construction of civil works.
4. All necessary State government approvals relating to this development must be obtained
prior to any works commencing on the site
5. Any damage to the external road pavement as a direct consequence of construction
activities associated with this approval shall be remedied by the applicant at the applicant’s
cost. In this regard, the road surface of the street network across the frontage of the site
shall be photographed prior to any works commencing on site and a condition report
submitted and agreed to prior to the pre-start meeting
6. Any damage caused to existing services and assets above or below the ground must be
repaired:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval
7. All works must be constructed and work procedure undertaken in accordance with:
(a) All relevant Department of Main Roads specifications, including the current MUTCD
for works within the existing road reserve
(b) All relevant Sunshine Coast Regional Council Planning Scheme Policies, standard
drawings and guidelines
(c) The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site
(d) Provision of the Workplace Health and Safety Act and such other legislation as is
applicable to workplace health and safety
(e) Where applicable, the Queensland Sewerage and Water Supply Act
(f) The list of approved plans/documents, conditions of this Decision Notice and
relevant conditions of the higher order approval viz. 2004/5744 to which this
approval relates
8. All works associated with this approval must be progressed in an expeditious manner to
completion. Council reserves the right to call up any performance bond held or levy charges
against the property should emergency works be required to be undertaken by Council to
Page 2 of 11
Document Set ID: 23113824
Version: 2, Version Date: 17/07/2024
[OCR of page images]
4. ASSESSMENT MANAGER CONDITIONS
DEVELOPMENT PERMIT FOR OPERATIONAL WORK (ENGINEERING WORKS -
ROADWORKS, DRAINAGE WORKS, STORMWATER, EARTHWORKS AND WATER &
SEWERAGE INFRASTRUCTURE)
Conduct an Engineering Prestart Meeting
1. Prior to any works commencing, a pre-start meeting for engineering works must be
conducted.
(a) No works are to commence on site prior to fencing of the vegetation to be protected.
General
2. Written advice must be provided of the contractor's name and the proposed date of
commencement of construction. An onsite prestart meeting must be organised with
Council's delegate giving five (5) working days advanced notice prior to the meeting being
conducted (refer to Advisory Notes)
3. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) competent in civil works and must be undertaken by a nominated principal
contractor experienced in the construction of civil works.
4. All necessary State government approvals relating to this development must be obtained
prior to any works commencing on the site
5. Any damage to the external road pavement as a direct consequence of construction
activities associated with this approval shall be remedied by the applicant at the applicant’s
cost. In this regard, the road surface of the street network across the frontage of the site
shall be photographed prior to any works commencing on site and a condition report
submitted and agreed to prior to the pre-start meeting
6. Any damage caused to existing services and assets above or below the ground must be
repaired:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval
7. All works must be constructed and work procedure undertaken in accordance with:
(a) All relevant Department of Main Roads specifications, including the current MUTCD
for works within the existing road reserve
(b) All relevant Sunshine Coast Regional Council Planning Scheme Policies, standard
drawings and guidelines
(c) The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site
(d) Provision of the Workplace Health and Safety Act and such other legislation as is
applicable to workplace health and safety
(e) Where applicable, the Queensland Sewerage and Water Supply Act
(f) The list of approved plans/documents, conditions of this Decision Notice and
relevant conditions of the higher order approval viz. 2004/5744 to which this
approval relates
8. All works associated with this approval must be progressed in an expeditious manner to
completion. Council reserves the right to call up any performance bond held or levy charges
against the property should emergency works be required to be undertaken by Council to
Page 2 of 11
Document Set ID: 23113824
Version: 2, Version Date: 17/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW12 0095 03Related documentApplication case desk ↗
About this file
- File size
- 175 KB (small file)
- File type
No other editions are linked here.