Minor Change Existing Approval OPW12 0095 03 · OPW12/0095.03

of 11

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                         make the site safe due to inactivity on the development site for extended periods of time.
                         In this regard, Council considers an extended period of inactivity to be greater than two
                         weeks (excluding inclement weather)
               9.        The supervising engineer must ensure that the works have been inspected and confirm
                         their acceptability at the completion of construction. Where municipal works are involved,
                         such confirmation must be submitted for the respective hold points prior to any site
                         inspection by Council officers. NB If Council officers are required to undertake additional
                         inspections of the same works, a reinspection fee will be applicable in accordance with
                         Council’s Fees and Charges Register applicable at the time
               10.       Any construction works to be undertaken in the vicinity of Council's existing municipal
                         infrastructure must not adversely affect the integrity of the infrastructure. All costs
                         associated with repair, replacement or alteration to existing infrastructure shall be met by
                         the developer.
               11.       Rock scour protection is to be provided at the outlet of all stormwater pipes (including
                         temporary outlets) and is to comply with the requirements of Appendix A of the publication
                         “Stormwater Outlets in Parks and Waterways” (Brisbane City Council, 2003)
               12.       The existing preload fill located opposite the proposed stormwater outlet points shall be
                         removed such that the outlets are free flowing and no ponding of stormwater occurs. The
                         extent of fill removed shall be determined onsite in consultation with Council’s Engineering
                         Officer Construction.
                         Preparation of a Construction Management Plan
               13.       The works identified in this Decision Notice must be carried out in accordance with an
                         approved Construction Management Plan endorsed by Council. The Construction
                         Management Plan must be submitted to Council for approval at least 10 business days
                         prior to the prestart meeting. In particular, the Construction Management Plan should
                         address the following:
                         (a)      The access point for all vehicles associated with the construction of the approved
                                  works,
                         (b)      traffic management during all aspects of the construction phase including:
                                  (i)     a Traffic Management Control Plan in accordance with the Manual of
                                          Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                                          and traffic control measures prior to construction
                                  (ii)    maintenance of safe pedestrian access across the frontage of the site both
                                          during daily construction and after daily construction has ceased
                                  (iii)   proposed fencing to the site during the construction phase of the
                                          development
                         (c)      maintenance and protection of water quality and existing drainage lines through the
                                  construction site, through the implementation of appropriate erosion and sediment
                                  control measures
                         (d)      works programme identifying key components of the works and their respective
                                  durations
                         (e)      establishment of a communication protocol with the general public, adjoining
                                  owners, emergency services and local businesses to advise of agreed construction
                                  times, impacts on traffic and services and other relevant issues
                         (f)      identification of complaint management procedures including:
                                  (i)     contact details for the on-site manager
                                  (ii)    dispute resolution procedures




                                                                                                       Page 3 of 11
Document Set ID: 23113824
Version: 2, Version Date: 17/07/2024


[OCR of page images]
10.

11.

12.

13.

make the site safe due to inactivity on the development site for extended periods of time.
In this regard, Council considers an extended period of inactivity to be greater than two
weeks (excluding inclement weather)

The supervising engineer must ensure that the works have been inspected and confirm
their acceptability at the completion of construction. Where municipal works are involved,
such confirmation must be submitted for the respective hold points prior to any site
inspection by Council officers. NB If Council officers are required to undertake additional
inspections of the same works, a reinspection fee will be applicable in accordance with
Council’s Fees and Charges Register applicable at the time

Any construction works to be undertaken in the vicinity of Council's existing municipal
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration to existing infrastructure shall be met by
the developer.

Rock scour protection is to be provided at the outlet of all stormwater pipes (including
temporary outlets) and is to comply with the requirements of Appendix A of the publication
“Stormwater Outlets in Parks and Waterways” (Brisbane City Council, 2003)

The existing preload fill located opposite the proposed stormwater outlet points shall be
removed such that the outlets are free flowing and no ponding of stormwater occurs. The
extent of fill removed shall be determined onsite in consultation with Council's Engineering
Officer Construction.

Preparation of a Construction Management Plan

The works identified in this Decision Notice must be carried out in accordance with an
approved Construction Management Plan endorsed by Council. The Construction
Management Plan must be submitted to Council for approval at least 10 business days
prior to the prestart meeting. In particular, the Construction Management Plan should
address the following:

(a) The access point for all vehicles associated with the construction of the approved
works,

(b) traffic management during all aspects of the construction phase including:

(i) a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction

(ii) maintenance of safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased

(iii) proposed fencing to the site during the construction phase of the
development

(c) maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures

(d) works programme identifying key components of the works and their respective
durations

(e) establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed construction
times, impacts on traffic and services and other relevant issues

(f) identification of complaint management procedures including:
(i) contact details for the on-site manager

(ii) dispute resolution procedures

Page 3 of 11

Document Set ID: 23113824
Version: 2, Version Date: 17/07/2024

Used in these records

About this file

File size
175 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval OPW12 0095 03.pdf · 175 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.