Minor Change Existing Approval OPW12 0095 03 · OPW12/0095.03

of 11

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

               18.       Easements (3.0 metres mininmum) must be provided over Unitywater rising mains within
                         the development site. A 4.0 metre wide easement is required over sewers greater than 3.0
                         metres deep. Easements must be centrally located over the main.
               19.       Provision of an access easement in favour of Unitywater, allowing vehicular access by
                         Unitywater to Unitywater rising mains within the development site.
               20.       Proposed tree plantings must maintain a minimum horizontal clearance of 1.5 metres from
                         Unitywater sewerage rising mains. Landscaping plants within these clearances must be
                         low growing when mature and suitable approved varieties.
               21.       During the maintenance period the applicant must carry out necessary repairs to: defects
                         and/or damage of road works; drainage and associated work; water supply and sewerage
                         reticulation and pump stations and associated equipment. These repairs include damage
                         and/or alterations caused by third parties carrying out works within the development.
               22.       No building or structure can encroach within an existing or proposed sewer easement
                         without the written approval of Unitywater.
               23.       Construction works undertaken in the vicinity of Unitywater’s existing water supply or
                         sewerage infrastructure must not adversely affect the integrity of the infrastructure. All
                         costs associated with repair, replacement or alteration to existing infrastructure must be
                         met by the applicant.
                5.      APPROVED PLANS
               The following plans are Approved plans for the development:
               Approved Plans

                Plan No.                  Rev     Plan/Document Name                          Date

                M1717E5-L01               A       Construction Staging Plan, prepared by 28   February
                                                  JFP Consulting Engineers               2018

                M1717E5-EW01              C       Earthworks Layout Plan, prepared by JFP 4 May 2018
                                                  Consulting Engineers

                M1717E5-EW02              B       Earthworks Details Plan, prepared by JFP 27 April 2018
                                                  Consulting Engineers

                M1717E5-R01               F       Roadworks Layout Plan, prepared by JFP 18 April 2024
                                                  Consulting Engineers

                M1717E5-R02               A       Roadworks Details Plan, prepared by JFP 28   February
                                                  Consulting Engineers                    2018

                M1717E5-R03               H       Roadworks Intersection Details Plan, 18 April 2024
                                                  prepared by JFP Consulting Engineers

                M1717E5-R04               A       Roadworks      Longitudinal     Sections 28 February
                                                  Swallow Street, prepared        by JFP 2018
                                                  Consulting Engineers

                M1717E5-R05               A       Roadworks Cross Sections Swallow 28     February
                                                  Street, prepared by JFP Consulting 2018
                                                  Engineers

                M1717E5-R06               B       Roadworks Longitudinal Sections Blue 10            January
                                                  Gum Street, prepared by JFP Consulting 2020
                                                  Engineers



                                                                                                     Page 6 of 11
Document Set ID: 23113824
Version: 2, Version Date: 17/07/2024


[OCR of page images]
18.

19.

20.

21.

22.

23.

Easements (3.0 metres mininmum) must be provided over Unitywater rising mains within
the development site. A 4.0 metre wide easement is required over sewers greater than 3.0
metres deep. Easements must be centrally located over the main.

Provision of an access easement in favour of Unitywater, allowing vehicular access by
Unitywater to Unitywater rising mains within the development site.

Proposed tree plantings must maintain a minimum horizontal clearance of 1.5 metres from
Unitywater sewerage rising mains. Landscaping plants within these clearances must be
low growing when mature and suitable approved varieties.

During the maintenance period the applicant must carry out necessary repairs to: defects
and/or damage of road works; drainage and associated work; water supply and sewerage
reticulation and pump stations and associated equipment. These repairs include damage
and/or alterations caused by third parties carrying out works within the development.

No building or structure can encroach within an existing or proposed sewer easement
without the written approval of Unitywater.

Construction works undertaken in the vicinity of Unitywater’s existing water supply or
sewerage infrastructure must not adversely affect the integrity of the infrastructure. All
costs associated with repair, replacement or alteration to existing infrastructure must be
met by the applicant.

 

| 5.

APPROVED PLANS |

The following plans are Approved plans for the development:

Approved Plans

 

 

 

 

 

 

 

Plan No. Rev Plan/Document Name Date

M1717E5-L01 A Construction Staging Plan, prepared by | 28 February
JFP Consulting Engineers 2018

M1717E5-EWw01 Cc Earthworks Layout Plan, prepared by JFP | 4 May 2018
Consulting Engineers

M1717E5-EW02 B Earthworks Details Plan, prepared by JFP | 27 April 2018
Consulting Engineers

M1717E5-R01 F Roadworks Layout Plan, prepared by JFP | 18 April 2024
Consulting Engineers

M1717E5-RO2 A Roadworks Details Plan, prepared by JFP | 28 February
Consulting Engineers 2018

M1717E5-RO3 H Roadworks Intersection Details Plan, | 18 April 2024

prepared by JFP Consulting Engineers

 

M1717E5-R04 A Roadworks Longitudinal Sections | 28 February

Swallow Street, prepared by JFP | 2018
Consulting Engineers

 

 

 

M1717E5-RO5 A Roadworks Cross Sections Swallow | 28 February
Street, prepared by JFP Consulting | 2018
Engineers

M1717E5-RO6 B Roadworks Longitudinal Sections Blue | 10 January

Gum Street, prepared by JFP Consulting | 2020
Engineers

 

 

 

 

 

Page 6 of 11

Document Set ID: 23113824
Version: 2, Version Date: 17/07/2024

Used in these records

About this file

File size
175 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval OPW12 0095 03.pdf · 175 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.