Minor Change Existing Approval OPW12 0095 03 · OPW12/0095.03
M1717E5-R07 A Roadworks Cross Sections Blue Gum 28 February
Street, prepared by JFP Consulting 2018
Engineers
M1717E5-R08 B Roadworks Sections Silver Gull 27 April 2018
Boulevard, prepared by JFP Consulting
Engineers
M1717E5-R09 A Roadworks Details, prepared by JFP 28 February
Consulting Engineers 2018
M1717E5-D02 E Drainage Layout Plan, prepared by JFP 27 September
Consulting Engineers 2018
M1717E5-D03 C Drainage Longitudinal Sections, prepared 4 June 2018
by JFP Consulting Engineers
6. REFERENCED DOCUMENTS
The following documents are referenced in the assessment manager conditions:
Referenced Documents
Document No. Rev. Document Name Date
M1717 B Stormwater Infiltration System 16 August 2006
Maintenance Plan for Noosa
Domain Retirement Village
Walter Hay Drive, Noosaville,
prepared by JFP Consulting
Engineers
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Engineering
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
2. Written advice must be provided of the contractor’s name and the proposed date of
commencement of construction prior to contacting Council's delegate on 5475 9866 to
arrange a pre-start meeting.
3. Council has undertaken an audit check of the Operational Works drawings in relations to
the proposed works. A detailed check of the calculations and drawings has not been
undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility
for all aspects of the engineering design. Council reserves the right to require further
amendments and/or additions at a later date should design errors become apparent.
4. This approval requires that contributed assets are provided to Council in a state consistent
with Council’s standards and specifications and the approved drawings at both the start
and end of the maintenance period. The applicant is responsible for ensuring that the
contributed assets meet these standards at the completion of the maintenance period. Any
damage caused to the contributed assets during the maintenance period is the
responsibility of the applicant.
Page 7 of 11
Document Set ID: 23113824
Version: 2, Version Date: 17/07/2024
[OCR of page images]
M1717E5-RO7 A Roadworks Cross Sections Blue Gum | 28 February
Street, prepared by JFP Consulting | 2018
Engineers
M1717E5-RO8 B Roadworks Sections = Silver — Gull | 27 April 2018
Boulevard, prepared by JFP Consulting
Engineers
M1717E5-RO9 A Roadworks Details, prepared by JFP | 28 February
Consulting Engineers 2018
M1717E5-D02 E Drainage Layout Plan, prepared by JFP | 27 September
Consulting Engineers 2018
M1717E5-D03 Cc Drainage Longitudinal Sections, prepared | 4 June 2018
by JFP Consulting Engineers
|6. | REFERENCED DOCUMENTS
The following documents are referenced in the assessment manager conditions:
Referenced Documents
Document No.
Rev. | Document Name
Date
M1717
B Stormwater Infiltration System | 16 August 2006
Maintenance Plan for Noosa
Domain Retirement Village
Walter Hay Drive, Noosaville,
prepared by JFP Consulting
Engineers
ADVISORY NOTES |
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Engineering
There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
Written advice must be provided of the contractors name and the proposed date of
commencement of construction prior to contacting Council's delegate on 5475 9866 to
arrange a pre-start meeting.
Council has undertaken an audit check of the Operational Works drawings in relations to
the proposed works. A detailed check of the calculations and drawings has not been
undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility
for all aspects of the engineering design. Council reserves the right to require further
amendments and/or additions at a later date should design errors become apparent.
This approval requires that contributed assets are provided to Council in a state consistent
with Council’s standards and specifications and the approved drawings at both the start
and end of the maintenance period. The applicant is responsible for ensuring that the
contributed assets meet these standards at the completion of the maintenance period. Any
damage caused to the contributed assets during the maintenance period is the
responsibility of the applicant.
Page 7 of 11
Document Set ID: 23113824
Version: 2, Version Date: 17/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW12 0095 03Related documentApplication case desk ↗
About this file
- File size
- 175 KB (small file)
- File type
No other editions are linked here.