Council archive · source document
Minor Change Report OPW19 0203 03 [As Published] · OPW19/0203.03
i. Changing the alignment of the stormwater line that exits the new gully pit in the cul-de-sac
from crossing the road formation to a new pit located within the site’ and
ii. Changing a number of internal stormwater pits.
The locality and proposal plan are included below.
Figure 1 – Locality
Figure 2 – Site Plan
Page 2 of 7
Document Set ID: 22799910
Version: 2, Version Date: 08/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report OPW19 0203 03 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 552 KB (small file)
- File type
No other editions are linked here.