Skip to the record
Every meeting, every word.

Council archive · source document

07/0466 - MCU - Fetached House - Bruce Alan Neville [As Published] · 132007.466

of 35

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997,

Works in tidal areas, coastal
management districts and fish habitat
areas
Ifyou answered YES to O85, and ticked any
boxes in 06), your application is required to be
assessed against and must comply with the Wild
Rivers Code.
ITyou answered YES to Q6 and ticked box j} in
Q6, your application Is required to be referred to
theEPA
Note: If specified works ara proposed in a tocat

. goverment area, itis prescribed tidal work ~ the
felevant local government will be the
assessment manager with he EPA asa.
concurrence agency
if you answered YES to QS, and ticked box ii} or
iif) In Q6, your application requires referral to
DPIF.
if you answered NO to Q5 and ticked box j) in
Q6, the application will not be accepted.

If you answered NO to QS, ticked box ii) in O6
and the development is necessary to install
authorised works of Infrastructure where a
development permit is not required, or If a
required permit is held, ihe application must be
assessed against and must comply with the Wild
Rivers Cade. Applications for purposes olher
than specified works or as described above will
hot be accepted.

If you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will noi be accepted if the
development is proposed to be located in a HPA.
For more information about specified works sefer

to Guide 27

Residential, commercial or industrial
development

if you answered YES to Q7, your application is
Rot subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
tiver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

(f you answered NO to Q7 and ticked either box
i) of fi) in Q8, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
Is.the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-

Development in a wild river area)
aio Ores

The application is for one or more of the following:

O i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF

oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part 02 of Form 1); or

O iii) Building or operational works in a fish habitat area (ensure you have completed Part Oz of Form 1).

Is the application for residential, commercial or industrial development in a designated urban

area?
LJ yes

ao

If NO, does the application for residential, commercial or industrial development involve:

O i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

(J ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

Animal husbandry activities

If you answered YES to Q9 your application
requires assessment against and must comply
with the Wild Rivers Code.

‘The assessing agency is NRW.

Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wikd Rivers Act
2005 and refer to Guide 27.

Does the application involve a material change of use for animal husbandry activities (as defined

under the Wild Rivers Act 2005) in a PA?
rao -L] YES (ensure you have completed Part R of Form 1)

 

 

Agricultural activities

ityou answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural aclivities will
not be accepted if proposed in a HPA. For more
dataits and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
22.

The production of fodder in a PA, and pasture
Improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

10.

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?
ee

{f YES is the application for:
9 i) a material change of use; or
(J ii) operational works.

O YES (ensure you have completed Part Q of Form 1)

 

Page 11

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0466 - MCU - Fetached House - Bruce Alan Neville [As Published].pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.