Council archive · source document
07/0466 - MCU - Fetached House - Bruce Alan Neville [As Published] · 132007.466
INTEGRATED PLANNING ACT 1997 Works that take overland flow water Tha relevant wild river declaration will state Works thal take overtand flow water are either Self assessable or assessable, or are exempt from wild fiver requirements. tf you ticked 13 j}, your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. Mt you ticked 013 ii) an application is nat required to be made however the works must comply with the relevant self-assessable section of the Wild Rivers Code, otherwise the works become assessable development for which an application is required and must be assessed by NRW against the relevant part of the Wild Rivers Coda and must comply with the code. if you ticked Q13 iii) your apptication is not subject to wild river requirements. Applications for development that is other than that stated to be assessable, self-assessable or exempt will not be accepted. 12. Does the application involve works that take overland flow water in a HPA or an FMA? 13, IDAS Assessment Checklist, Version 19.0, 2 March 2007 CJno If YES, is the application for works stated in the relevant wild river declaration to be? (Ji) assessable works (J ii) setf-assessable works (J iii) exempt works (DYES (ensure you have completed Pat Ke of Form ] Works that interfere with overland flow water The relevant wild river declaration wil state works thal interfere with overland flow water that are eilher self assessable, assessable or exempt from wild river requirements, lf you tcked Q15:i), your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. If you ticked Q15 ii) an apptication is not sequired to be made however the works must comply wilh the relevant self-assessable section of the Wild Rivers Code, otherwise the works become assessable development for which an application is required and must be assessed by NRW against the selevant pari of the Wild Rivers Coda and must comply with the code. Hf you ticked Q15 iii) your application is not Subject to wild river requirements, Applications for development that is other than that stated to be assessable, setf-assessable or exempt will not be accepted. Waterway barrier works Applications for building or raising waterway barrier works in a HPA will not be accepted. If you answered YES to Q16, your application must be assessed by DPIF against the Wild Rivers Code and must comply with the code. Aquaculture (non ERA) Applications for aquaculture in a HPA will not be accepted. lf you answered YES to Q17, your application must be assessed by DPIF against the Wild Rivers Code and must comply with the code. 16. Does the application involve works that interfere with overland flow water in a FMA? CIno [71 YES (ensure you have completed the relevant Part K of Form 1) If YES, is the application for works stated in the relevant wild rivers declaration to be? (3) assessable works ‘ (ii sett-assessable works CD iti) exempt works Does the application involve building or raising waterway barrier works in a PA? O NO oO YES (ensure you have conipleted Part Os of Form 1) Does the application involve aquaculture in a PA? oO NO O YES (ensure you have completed Part Or of Form 1) Works that interfere with water in a watercourse Note: If the development is proposed in a HPA, applications for all works that interfere with water in @ watercourse (including dams or weirs, ‘stream realignment or stream diversion) will not be accepted. In a PA, applications for instream dams and weirs may be accepted in nominaled walerways. if you ticked box ii) In Q19, your applicalion will not be accepted. Note: Operational works outside a HPA or nominated waterway are not subject to wild river requirements. More information and locations of nominated waterways is available by contact NRW, accessing ihe department's website www. new.qid.gov.au of conlacting the department by email on: wild [email protected] the application involve operational works that interfere with water in a watercourse that is in a nominated waterway in a PA? (No (1 YES (ensure you have completed the relevant Part K of Form 1) If YES, . (Ji) The application is for an instream dam or weir; or [J ii) The application is for operational works that interfere with water in a watercourse, and is for development other than a dam or weir. Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0466 - MCU - Fetached House - Bruce Alan Neville [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.