Log in to see the plans as drawnCHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 14
3.2 URBAN DESIGN
3.2.1 Design Workshop
A principle purpose of MP2 is to present a refined layout plan for the Shire Business Centre. To facilitate the
preparation of such a plan, Council held a day long workshop on 5 September 2002. A range of participants were
present at the workshop including -
Councillors
Council staff
Representatives of property owners and Stockwell (a company proposing to develop part of the Shire
Business Centre)
Consultant architects/urban designers
Consultant traffic engineers
Local architects
Key outcomes of the workshop were-
A preferred master plan of layout for the various land use elements
Identification of preferred locations for a civic precinct and an inter-regional transit facility
Some preferred urban design themes
Refinement of open space strategies
Identification of access issues
Improved pedestrian focus
More utility to the internal loop road
Better integration of future development and use of the two properties that comprise the Shire Business
Centre site
Resolution of a connection to the adjoining industrial area
The workshop has been followed by further discussion between the architects and traffic engineers to
determine whether preferred access arrangements could be resolved. While complete agreement was not
reached, access was largely resolved in principle with Council being called upon to determine the
placement of the two roundabouts in Walter Hay Drive and the additional access from Eenie Creek Road,
which offer access into the site.
3.3 RETAIL DEVELOPMENT
Section 19.3.1.2 of the Strategic Plan nominates retail development outcomes for the site of
Retail shops of the order of 15,000m2 of floorspace with a discount department store to be in the first stage
Homemaker and showrooms of the order of 10,000m2
Council engaged Urban Economics in 1999/2000 to conduct independent investigations on the economic
impacts of a development proposal by. Conclusions from those investigations were-
An 18,300m2 sub-regional shopping center has market support for an opening by 2004.
The impact of the sub-regional center can be contained within manageable levels provided the
future expansion of the retail network is contained. It is expected the sub-regional center will create
an impact upon the retail network [that] falls just short of being significant. During 2004 it can be
expected there will be some closures and relocations to the Shire Business Centre. It is expected
that all existing retail nodes will continue to perform at their designated function in the retail
network.
\\stratplan\psreview\Planning Scheme\Planning Studies\Shire Business Centre\Masterplan-FinalApr03.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.