2019-10-28 Special Meeting Agenda - Item 1 - Attachment 4 - RAL18-0023 - Master Plan Stage 2

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2                                                                       14


3.2        URBAN DESIGN
3.2.1 Design Workshop

           A principle purpose of MP2 is to present a refined layout plan for the Shire Business Centre. To facilitate the
           preparation of such a plan, Council held a day long workshop on 5 September 2002. A range of participants were
           present at the workshop including -

                      Councillors
                      Council staff
                      Representatives of property owners and Stockwell (a company proposing to develop part of the Shire
                      Business Centre)
                      Consultant architects/urban designers
                      Consultant traffic engineers
                      Local architects
                       Key outcomes of the workshop were-

                      A preferred master plan of layout for the various land use elements
                      Identification of preferred locations for a civic precinct and an inter-regional transit facility
                      Some preferred urban design themes
                      Refinement of open space strategies
                      Identification of access issues
                      Improved pedestrian focus
                      More utility to the internal loop road
                      Better integration of future development and use of the two properties that comprise the Shire Business
                      Centre site
                      Resolution of a connection to the adjoining industrial area
                       The workshop has been followed by further discussion between the architects and traffic engineers to
                       determine whether preferred access arrangements could be resolved. While complete agreement was not
                       reached, access was largely resolved in principle with Council being called upon to determine the
                       placement of the two roundabouts in Walter Hay Drive and the additional access from Eenie Creek Road,
                       which offer access into the site.

3.3        RETAIL DEVELOPMENT
           Section 19.3.1.2 of the Strategic Plan nominates retail development outcomes for the site of

                      Retail shops of the order of 15,000m2 of floorspace with a discount department store to be in the first stage

                                 Homemaker and showrooms of the order of 10,000m2

                       Council engaged Urban Economics in 1999/2000 to conduct independent investigations on the economic
                       impacts of a development proposal by. Conclusions from those investigations were-
                                 An 18,300m2 sub-regional shopping center has market support for an opening by 2004.
                                 The impact of the sub-regional center can be contained within manageable levels provided the
                                 future expansion of the retail network is contained. It is expected the sub-regional center will create
                                 an impact upon the retail network [that] falls just short of being significant. During 2004 it can be
                                 expected there will be some closures and relocations to the Shire Business Centre. It is expected
                                 that all existing retail nodes will continue to perform at their designated function in the retail
                                 network.

\\stratplan\psreview\Planning Scheme\Planning Studies\Shire Business Centre\Masterplan-FinalApr03.doc
Log in to download the original file

2019-10-28 Special Meeting Agenda - Item 1 - Attachment 4 - RAL18-0023 - Master Plan Stage 2(PDF, 745KB).pdf · 763 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.