The Premium Outlet Centre as proposed in the earlier Montbar application, would compete strongly
with Hastings Street retailers, which target tourists, offering mainly premium brands at low prices.
The impact [of the proposed Premium Outlet Centre] upon the Hastings Street retail node is likely
to be significant in both dollar values and its ultimate composition.
From the above conclusions and in consequence of the Montbar application, the following revised
development parameters are concluded as acceptable outcomes for the site-
Retail shops of the order of 18,300m2 of floor space with a discount department store to be in the
first stage
Homemaker and showrooms of the order of 7,000m2 floor space
No Premium Outlet Centre or other significant retail development.
3.4 DEVELOPMENT SEQUENCING
Section 19.3.1.5 of the Strategic Plan calls for the Master Plan to include sequencing guidelines for the overall
development, designed to co-ordinate with the construction of roads servicing the site and other relevant issues.
The first stage of development will contain a shopping center with a Discount Department Store as called for by
the Strategic Plan. That will bring a requirement for a suitable external road network and access arrangements
into the site. The Strategic Plan nominates that the first stage of development will only proceed after-
The construction of Eenie Creek Road between Eumundi Road and Reef Street [completed 2002]
Commitments being made for the construction of Walter Hay Drive. [This road is the subject of an
agreement between Council and Main Roads Department]
The internal road system will need to be sufficiently advanced to service a shopping center, as it is a high
generator of traffic. With the first stage there will need to be additional development outcomes as follows-
An established landscape theme for the developed precincts
A suitable stormwater management system
Entry treatments
Appropriate signage
Commencement of the associated pedestrian and bikeway network and related external links
Interim transport circulation strategies in the absence of the loop road being complete [The loop
road may be completed in stages]
Two accesses into the site are preferred unless Council is satisfied that a single access is
acceptable
Dedication of the lower part of the land as public open space.
Community consultation has indicated a concern that the Shire Business Centre should demonstrate at an
early stage that it is to be developed for more employment opportunities than through retailing alone. It
would be reasonable for Council to acknowledge those concerns and to require that a substantive amount
of non-retailing development should take place in the first stage. The minimum standards applicable to
this non-retail development are:-
An area of floor space equivalent to 20% of any retail floor space, is to be constructed prior to such
retail development operating; and
40% of the non-retail development floor space is to be contracted for sale or lease, prior to the
retail development operating.
\\stratplan\psreview\Planning Scheme\Planning Studies\Shire Business Centre\Masterplan-FinalApr03.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.