Original source · versioned page text
2019-10-28 Special Meeting Agenda - Item 1 - Attachment 4 - RAL18-0023 - Master Plan Stage 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 17
k. Access intersections off Walter Hay Drive are to be via roundabouts in the locations identified onMP2
Plan. The form of the access intersection from Eenie Creek Road is yet to be determined by Council.
3.6 ECOLOGICALLY SUSTAINABLE DEVELOPMENT
Development and operation of the Site shall be undertaken in a manner that works within the ecological
constraints and does not place ecological values at risk. This approach is reflected in the objectives, intents and
performance standards for individual sub-precincts (see Table 4.3).
Additionally, the first 2 design principles of Section 3.1 nominate -
The site should be developed as a centre of urban design and environmental excellence in both built and
natural environments, showcasing the attributes of the site, the environmental capabilities of the Shire and
best practice environmental technologies.
Key design elements should include an integrated public transport system including bike and pedestrian
pathways; energy-efficient design; the generation of renewable energy; integration between the built form
and the landscape fabric; low key informal places; a visual relationship between indoor and outdoor
spaces; waste minimisation; and recycling.
These general principles are to be extended into the design approaches for buildings and sites and also
into the management phases after operations commence. Development applications will be assessed for
attention to these principles and appropriate conditions will be imposed on approvals to achieve these
outcomes. Environmental management plans will be prepared for all stages of development.
Additional development concepts supportive of ESD principles are to be adopted by developers wherever
practicable and shall include-
A preference for energy efficient building material, including choice of glass
Installation of energy efficient hot water systems, preferably solar for small scale water usage or
heat pump
Use of grid-connected photovoltaic devices and associated community education
Use of low energy lighting systems and maximized use of natural light
Passive solar designs and best practice low consumption power needs
Cross ventilation techniques to minimize air-conditioning requirements
Window openings to be optimize natural light and to be screened for balance of light and heat
Solar panels to be located to cause no reflective glare nuisance
Installation of water re-use tanks for landscaping
Use of appliances having the most favourable energy rating.
3.7 OPEN SPACE AND LANDSCAPING
Open space has important functions for the site. In the southern part the land is constrained for development due
to flood potential and environmental reasons. This area should be retained in its natural state and dedicated for
public open space. It will form an important character element for the site and entry to the Shire along Walter Hay
Drive.
\\stratplan\psreview\Planning Scheme\Planning Studies\Shire Business Centre\Masterplan-FinalApr03.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.