Log in to see the plans as drawnCHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 30
SUB- PRIMARY SECONDARY OBJECTIVE STRATEGIC PLAN INTENT & PERFORMANCE STANDARDS
PRECINCT FUNCTION FUNCTION PROVISIONS (with
direct influence)
b. Existing vegetation may be enhanced by additional plantings of appropriate species.
c. Revegetation of any areas disturbed during construction activities is to be carried out using species endemic
to these open space areas.
RES Residential Employment Support Provision of the residential support 19.3.1.9 Sub-Precinct RES is intended to provide support accommodation to other key sub-precincts on the site.
(0.7 ha.) facilities for other key components Consequently, there will be strong associations between the use of Sub-Precinct RES and that of Sub-Precincts
of the Shire Business Centre. E1 and E2 and other sub-precincts. Residential development is intended as an adjunct to development in other
sub-precincts, rather than stand-alone accommodation for permanent occupation. Accommodation that is not
self-contained such as hostel style would be appropriate.
a. Specific floor space allocations will be considered as part of any relevant development application, however
by way of guide, plot ratio for development within the sub-precinct up to 0.6.
b. Building heights of up to 2 storeys.
c. Development to have strong visual linkages with Sub-Precinct OS4.
d. Development to have strong pedestrian and bikeway connectivity with Sub-Precincts B1, E1 and E2 .
e. Vehicular parking will be provided on-site.
f. Development expected to be staged, consistent with development in Sub-Precincts E1 and E2.
g. Development will acknowledge the open space function of the adjoining Sub-Precinct OS4.
h. The Sub-Precinct shall have a minimum open space area of 15%.
i. External building design treatment shall accord with provisions of the Residential Low Density Zone of the
Planning Scheme
REC/MU Recreation / Minor Recreation Retention of open space character 19.3.1.9 & 19.3.1.12 This sub-precinct is constrained for development [See Section 3.7] and may be assessed for use for minor
Mixed Use / Use, Minor Mixed and values and protection of recreational development. Alternatively the land may be used for a minor mixed use development including
Open Space Use or Open Space adjacent national park business activity that need not be associated with the balance of the site. Retention of open space values both
(1.6 ha) on the site and for the adjacent national park are important outcomes.
a. Development to be low intensity and involve retention of substantial existing vegetation.
b. Plot ratio to be less than 0.1
c. Buildings to be one storey.
\\stratplan\psreview\Planning Scheme\Planning Studies\Shire Business Centre\Masterplan-FinalApr03.doc