Original source · versioned page text
BsmRevRpt2
Attached to the e-mail REC13/0146 - Response to 2nd Information request.
List Of Contents 1. Summary 3 2. Introduction 4 3. Response To Noosa Council Information Request 5 4. Response To Saunders Submission 8 5. Stormwater Detention Requirement 9 6. Stormwater Discharges To No 2 Pearsons Road 10 7. Runoff Rates To Floodway Model 12 7.1 Catchment Areas And Subdivision 12 7.2 Design Rainfall Data 12 7.3 Model Calibration 14 7.4 Linkage From Catchment Model To Floodway Model 15 8. Floodway Profiles, Pre-Development 17 9. Floodway Profiles, Post-Development 21 9.1 Mitigation Concept For Increased Stormwater Runoff 21 9.2 Model Simulation 21 9.3 Sensitivity Test 22 10. Certification 23 List Of Figures (following text) 1 Locality And Lot Plan 2 Urbs Models Of Stormwater Detention Requirement 3 Proposed Change In Discharge Scenarios To No 2 Pearsons Road 4 Catchment Subdivision For Pre-Development Urbs Model 5 Catchment Subdivision For Post-Development Urbs Model 6 XPStorm Hydraulic Model Network 7 Photographs Of Eastern Floodway On 25 November 2013 8 Photographs Of Western Floodway On 25 November 2013 9 Proposed Floodway Modifications, Bridge And Bio-Detention Ponds 10 Longitudinal Floodway Profiles 11 Floodway Cross-Section Changes – West Tributary 12 Footbridge And Bio-Basin Schematics 13 Flood Levels And Flood Boundaries Appendices A. Design Rainfall Data B. Rational Method Calculations Of Floodway Inflows, Pre-Development C. Rational Method Calculations Of Floodway Inflows, Post-Development D. Floodway Storage Volumes Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.