BsmRevRpt2
Attached to the e-mail REC13/0146 - Response to 2nd Information request.
1.0 SUMMARY
This report has been revised in response to Noosa Council’s 18 July 2014 information request. Responses
to the relevant items in that information request are stated in Section 3 of the report. The applicant has
also received a copy of a 3 September 2014 submission to Council from the owners of an adjoining
property (JR & F Saunders), and comments on that submission are stated in Section 4 of the report.
This analysis has found that the development’s stormwater detention requirement can be achieved by
deliberately “roughening” the floodways (by revegetating the riparian zones, as required by Council), by
excavating a side-storage alongside the western tributary, and by constructing a restrictive footbridge
across the eastern tributary to back-up the flood profiles in that floodway, to augment the small amount of
conventional detention storage that can be gained in two bio-basins on the site (as in Figures 9 to 12).
In fact, the nett gains in flood storage volumes generated by these works will substantially exceed the
detention volumes that would otherwise be required of a fully conventional detention system, as shown in
Table 1, below.
Table 1: Comparison Of Pre-Development And Post-Development Floodplain Volumes (m3)
To Required Detention Volumes
1Year 2 Year 5 Year 10 Year 20 Year 50 year 100 Year
Pre-Development 5536 6311 8787 10202 11576 13125 14483
Floodway Storage
Post-Development 5909 6775 9607 11697 13389 15383 16849
Floodway Storage
Floodway Gain 373 464 820 1495 1813 2258 2366
Plus Bio-Basins 162 183 252 252 252 252 252
Less Park, Bund Fill -0 -0 -0 -0 -5 -40 -72
Nett Gain 535 647 1072 1747 2060 2470 2546
Req’d Extra Volume
(Conventional 395 525 770 910 1095 1370 1585
Detention)
The abovementioned works, together with a minor regrading of the invert profile around node 5 (as also
shown on Figure 10) will result in the development having practically nil adverse impact on flood levels
on adjoining properties, as summarised in Tables 19 to 21 of this report.
The works will also result in practically nil adverse impact on downstream peak flow rates, apart from a
slight increase in flows along the western tributary through the immediately adjoining downstream
property (No2 Pearsons Road). That increase in creek flows across the adjoining property results from the
deliberate diversion of local runoff away from that adjoining property, and directly to the western
floodway upstream of that property. Downstream of the natural point of inflow to the floodway for that
runoff, the flows revert to their pre-development rates.
The consequent flood levels for design of the development are summarised in Tables 19 to 21 and in
Figure 13 of this report. A sensitivity test has identified the impact of uncontrolled floodplain regrowth
on the abovementioned design levels. The consequent 100 year flood levels are summarised in Table 24
and in Figure 13, and appropriate account should be taken of these levels when considering appropriate
design levels for the development.
Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.