Skip to the record
Beware of cheap imitations.

Original source · versioned page text

BsmRevRpt2

Attached to the e-mail REC13/0146 - Response to 2nd Information request.

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Concentration Times


Subareas 1 - 5

Average Stream Velocity: 5-6% catchment slope = hilly; T = 1206 / 0.9 x 60 = 22 mins

Components Of Flow: 40 m sheet flow @ 10%        = 9 mins
                    530 m steep [email protected] m/sec = 7 mins
                    730 m [email protected] – 1.1 m/sec = 12 mins
                     Total:                          28 mins

Bransby-Williams: T = 58 L / A0.1 Se0.2 = 58 x 1.206 / 66.8 0.1 x 1.04 0.2 = 46 mins

From 22, 28, 46 mins (average 32) : Adopt Tc = 30 mins




Subarea 7

55 m sheet flow @ 4-5% = 12 mins
230 m swale/channel @ 5% = 4 mins
Total:                     16 mins



Subarea 8

130 m sheet flow, partly lawn @ 7% = 16 mins




Subarea 9

85 m sheet flow @ 8% = 13 mins



   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                 Page 41
Log in to download the original file

BsmRevRpt2.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.