Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

BsmRevRpt2

Attached to the e-mail REC13/0146 - Response to 2nd Information request.

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Subareas 12 — 16

Std inlet time for 10% grade = 9 mins
150 m pipe/kerb along Tewantin Rd@ 6% = 1.2 min
60 m pipe/kerb along Kauri St@ 4% grade = 0.6 mins
115 m pipe/kerb along Pearl St @ 4% grade = 1.2 mins
115 m pipe flow to sapphire [email protected]% grade = 1.8 mins
260 m open easement [email protected]% grade = 6.0 mins

370 m natural floodway @ hydraulic model 0.8 m/sec = 7.7 mins
Total: = 27 mins

Subarea 17

130 m sheet flow @ 4% = 19 mins

Subarea 18

90 m sheet flow @ 4%, partly lawn = 16 mins

Subarea 19

85 m sheet [email protected]%, average grass = 19 mins
85 m natural [email protected] m fall = 5 mins
Total: 24 mins

Q=0.00278 x FxCxIx A

(F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subs Fi | C10 Tc I (mm/hr) A Q (m3/s)
(min)| 1/2 / 5 / 10 / 20 / 50 / 100 | (Ha)} 1/2 /5 / 10 / 20 / 50 / 100
1-5 | 0.21 | 0.74 | 28 60/67 / 90 / 107 / 123 / 140 / 155 | 66.8 | 6.0/7.6/11.5/14.2/16.9 /21.5 /24.6
7 0.20 | 0.74 | 16 80/90 /120/ 140 / 158 / 183 / 202 | 2.2 | 0.29/0.35/0.52/0.63 / 0.75/ 0.95/ 1.10
8 0.06 | 0.71 16 80/90 /120/ 140 / 158 / 183 / 202 | 2.0 | 0.25/0.30/0.45 /0.55 / 0.65 / 0.83/ 0.96
9 0.10 | 0.72 | 13 89 /100/133/ 155 / 175 / 201 / 221 | 1.64 | 0.23/0.27/ 0.40 / 0.49 / 0.59 / 0.74 / 0.85
12-16 | 0.50 | 0.80 | 24 61/73/ 98 / 116 / 130 / 153 / 165 | 44.4 | 4.8/5.8 /8.6 /10.8 /12.8 /16.3/18.7
17 0.00 | 0.70 | 19 73: 182/109 / 129 / 148 / 167 / 186 | 1.9 | 0.22/0.26/ 0.38 / 0.48 / 0.57 / 0.71 / 0.83
18 0.04 | 0.71 16 80/90/120/ 140 / 158 / 183 / 202 | 1.7 | 0.21/0.26/0.38/0.47/0.56/0.71/0.81
19 0.09 | 0.72 | 24 65/ 73/ 98/ 116/ 130/ 152 / 166 | 1.99 | 0.21/0.25 / 0.37 / 0.46 / 0.54 / 0.70 /0.79

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc

Page 42
Log in to download the original file

BsmRevRpt2.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.