Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 F »
NOOSA NORTH SHORE ECO-TOURISM PORTAL q Cardno

4. EFFLUENT IRRIGATION MANAGEMENT PLAN

 

4.1 Terminology

The term Principal refers to Petrac Leisure NNS-S Pty Ltd.

The term Operator refers to any party or company responsible for operation of the STP
facility and infrastructure and the effluent irrigation system.

The term Contractor refers to any party or company performing works associated with
operation of the sewage treatment plant and effluent irrigation system and includes all
employees of the Contractor and sub-contractors.

The term Consultant refers to the civil and/or environmental engineering consultant
employed by the Principal.

The term Works refers to all matters associated with the sewage treatment plant and
effluent irrigation system.

The term EPA refers to the Environmental Protection Agency.
The term EIMP refers to this Effluent Irrigation Management Plan.
The term Act refers to the Environmental Protection Act 1994.

4.2 EIMP Structure

This EIMP includes the following key components:
e Rationale: identification of the element to be managed and the environmental
impact of activities associated with each element.

e Objectives: identification of the environmental objectives and targets to be
achieved in line with the rationale and in compliance with applicable legislation.

e Tasks/Actions: monitoring and management measures to be implemented in order
to achieve the stated objectives and targets and to ensure impact mitigation.

e Performance Indicators: measurable indicators and standards set to assess the
efficiency of management measures and determine compliance with the EMP.

e Monitoring: monitoring requirements to measure compliance with the performance
indicators and frequency of monitoring.

e Reporting and Review: the requirements for reporting of monitoring results and
review of management measures where required.

e Corrective Action: measures to be undertaken should monitoring indicate non-
compliance with performance indicators.

 

Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006
1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 6

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.