Council archive · source document
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 F » NOOSA NORTH SHORE ECO-TOURISM PORTAL q Cardno 4. EFFLUENT IRRIGATION MANAGEMENT PLAN 4.1 Terminology The term Principal refers to Petrac Leisure NNS-S Pty Ltd. The term Operator refers to any party or company responsible for operation of the STP facility and infrastructure and the effluent irrigation system. The term Contractor refers to any party or company performing works associated with operation of the sewage treatment plant and effluent irrigation system and includes all employees of the Contractor and sub-contractors. The term Consultant refers to the civil and/or environmental engineering consultant employed by the Principal. The term Works refers to all matters associated with the sewage treatment plant and effluent irrigation system. The term EPA refers to the Environmental Protection Agency. The term EIMP refers to this Effluent Irrigation Management Plan. The term Act refers to the Environmental Protection Act 1994. 4.2 EIMP Structure This EIMP includes the following key components: e Rationale: identification of the element to be managed and the environmental impact of activities associated with each element. e Objectives: identification of the environmental objectives and targets to be achieved in line with the rationale and in compliance with applicable legislation. e Tasks/Actions: monitoring and management measures to be implemented in order to achieve the stated objectives and targets and to ensure impact mitigation. e Performance Indicators: measurable indicators and standards set to assess the efficiency of management measures and determine compliance with the EMP. e Monitoring: monitoring requirements to measure compliance with the performance indicators and frequency of monitoring. e Reporting and Review: the requirements for reporting of monitoring results and review of management measures where required. e Corrective Action: measures to be undertaken should monitoring indicate non- compliance with performance indicators. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.