Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 F >) NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno 4.3 Relevant Legislation The primary legislation relevant to this EIMP is the Environmental Protection Act 1994 (EP Act). The EP Act protects environmental values through development and implementation of environmental protection policies and regulates environmentally relevant activities prescribed in the Environmental Protection Regulation 1998. The Environmental Protection (Water) Policy 1997 (EPP Water) ensures protection of environmental values from activities that may result in the release of contaminants to waterways or stormwater drains. 4.4 Program and Contractual Obligations The EIMP covers the operation phase of the works. This is defined as the period from the commencement of sewage treatment and disposal works to the substantial completion of the sewage treatment and disposal works. The Principal is generally responsible for ensuring that the provisions of the EIMP are met, with the exception of certain planning or design issues, which are explicitly noted throughout the EIMP as being the responsibility of the Contractor or the Consultant. The Principal shall ensure that all persons who are to be employed or sub-contracted for the works shall be trained as to their individual responsibilities as set out in this EIMP and as provided by the Act, including the following. General Environmental Duty — whereby a person in the performance of their duties shall not do so in a manner which will cause, or is likely to cause, environmental harm unless the person takes all reasonable and practical measures to prevent or minimise the harm. Duty to Notify Environmental Harm — whereby if a person in the performance of their duties becomes aware that serious or material environmental harm is caused or threatened, then the person must contact the Contractor whereupon the Contractor must immediately notify the Principal and/or the EPA. Compliance with the EIMP — whereby a person in the performance of their duties shall do so in a manner that ensures that the provisions of this EIMP are complied with. 4.5 Non-Compliance and Corrective Action Requirements The Principal shall assume responsibility for implementation of this EIMP. Where the Principal becomes aware of a site or operational condition that does not comply with stated performance indicator(s) of this EIMP, there is a requirement for corrective action. A Corrective Action Request (“CAR”) form is to be completed and authorised where appropriate in general compliance with the example CAR form provided in Appendix A of this EIMP. The Principal is also required to maintain a register of CARs, which shall demonstrate that appropriate actions have been completed within a suitable timeframe. Any CAR registered in accordance with this EIMP shall be provided to the Principal, any State or Commonwealth Government Department, any statutory authority or other person, consensually or as lawfully required. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.