Council archive · source document
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL Cardno G 4.6 Element 1: Effluent Storage Lagoon RATIONALE: Uncontrolled discharge from the effluent storage lagoon may result in impacts on soils, surface water and groundwater. Management measures are required to prevent uncontrolled discharges. OBJECTIVE: To operate and manage the effluent storage lagoon to prevent deterioration of receiving environments. TASKS/ ACTIONS: e The storage lagoon shall be constructed with a 600mm impermeable clay lining to reduce the possibility of infiltration of treated effluent to groundwater e Stormwater diversion banks/drains shall be installed around the effluent storage lagoon to exclude overland runoff from entering the lagoon. e The storage lagoon shall be operated and maintained to ensure lagoon stability and prevent discharge through the bed or banks of the lagoon. e In the event that effluent levels within the lagoon rise within 1m of the top level, super-irrigation of the effluent irrigation areas shall be undertaken. e Where super-irrigation is not possible due to wet weather or soil conditions, the excess effluent shall be tankered to a licenced effluent disposal facility. e Where effluent quality within the lagoon is determined by monitoring to be not in compliance with the specified release limits, effluent shall be transported back to the STP for re- treatment. PERFORMANCE INDICATORS: Quality of effluent released from the effluent storage lagoon shall comply with the following water quality objectives specified by EPA in the Negotiated Decision Notice. Parameter Quality Criteria Release Limit Biochemical Oxygen Demand (BOD) 20mg/L maximum Dissolved Oxygen (DO) 2.0mg/L minimum Suspended Solids (SS) 20mg/L maximum pH 6.5 — 8.5 range Total Nitrogen (TN) 5mg/L maximum Total Phosphorous (TP) Aimg/L maximum Free Residual chlorine 0.3 - 0.7mg/L range Faecal Coliforms (FC) < 10 cfu/100mI < 100 cfu/100ml median maximum Turbidity 2 NTU 80" percentile MONITORING: Levels within the effluent storage lagoon shall be monitored on a weekly basis. The quality of effluent in the treated effluent storage dam shall be monitored on a quarterly basis for pH, conductivity BOD, DO, SS, TN, TP, FC, ammonia, nitrite and nitrate, turbidity and residual chlorine. Petrac Leisure NNS-S Pty Ltd 1\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 4 Version 2.doc Version 2 17 July 2006 Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.