Skip to the record
Search everything, all in one place.

Council archive · source document

Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 F »
NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno

 

In some instances, further investigation or monitoring may be required to establish
whether the Principal has failed to adequately implement the EIMP, or has failed to
comply with relevant legislation, guidelines and statutes. In these instances, an
independent party such as the Consultant shall carry out the investigation or
monitoring. If it is established that the cause for non-compliance with the stated
performance indicator(s) has arisen from the Contractor's actions or omissions, then
the costs of the monitoring shall be deducted from payments to the Contractor and paid
to the Consultant, otherwise the costs of the monitoring shall be obtained from the
Principal and paid to the Consultant.

 

Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006
1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 8

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.