Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 F » NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno In some instances, further investigation or monitoring may be required to establish whether the Principal has failed to adequately implement the EIMP, or has failed to comply with relevant legislation, guidelines and statutes. In these instances, an independent party such as the Consultant shall carry out the investigation or monitoring. If it is established that the cause for non-compliance with the stated performance indicator(s) has arisen from the Contractor's actions or omissions, then the costs of the monitoring shall be deducted from payments to the Contractor and paid to the Consultant, otherwise the costs of the monitoring shall be obtained from the Principal and paid to the Consultant. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.