Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1
NOOSA NORTH SHORE ECO-TOURISM PORTAL qC Cardno

 

 

1) | Complete a Complaint register form.

2) The Principal shall determine if the complaint is valid and if
further action is required.

3) The Principal shall determine whether notification to the EPA
is required.

4) — The complainant shall be notified within 24 hours advising of
actions that will be taken.

5) If the issue cannot be investigated and finalised within 24
hours, then information regarding the preliminary assessment
of the complaint and a date when a full response will be
available shall be provided within 24 hours.

6) | The complaint response must be signed off by the Principal
indicating that it has been dealt with satisfactorily.

Should the investigation of a complaint reveal a non-conformance
with the requirements of the EPA, then a non-conformance is to be
raised and the corrective action process initiated.

Environmental Incident

The Principal shall make an assessment of any events that may be
considered an environmental incident.

The Principal shall notify the EPA of any incidents that have caused
environmental harm.

An Environmental Incident Form shall be completed for any
environmental incidents.

All environmental incidents shall be classified as non-conformances
and corrective action initiated.

Variations in Groundwater Quality

In the event that variations in groundwater quality are greater than
10% of the established baseline levels, further investigations shall be
undertaken by a suitably qualified consultant in consultation with
Council and the EPA to determine the source of contamination and
the requirements for remedial actions.

 

 

 

 

MONITORING: This EIMP element shall be continually reviewed and maintained to
ensure that the best possible contingency situation management
procedures are in place.

REPORTING: Operators shall submit monthly reports to Council during construction

and establishment phases providing details of any environmental
incidents and emergencies and corrective actions undertaken.

The Principal shall report any emergency situations to the EPA as
soon as is practicable after the emergency situation occurs.

 

 

Petrac Leisure NNS-S Pty Ltd

Version 2 17 July 2006

1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 17

 

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.