Council archive · source document
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL qC Cardno 1) | Complete a Complaint register form. 2) The Principal shall determine if the complaint is valid and if further action is required. 3) The Principal shall determine whether notification to the EPA is required. 4) — The complainant shall be notified within 24 hours advising of actions that will be taken. 5) If the issue cannot be investigated and finalised within 24 hours, then information regarding the preliminary assessment of the complaint and a date when a full response will be available shall be provided within 24 hours. 6) | The complaint response must be signed off by the Principal indicating that it has been dealt with satisfactorily. Should the investigation of a complaint reveal a non-conformance with the requirements of the EPA, then a non-conformance is to be raised and the corrective action process initiated. Environmental Incident The Principal shall make an assessment of any events that may be considered an environmental incident. The Principal shall notify the EPA of any incidents that have caused environmental harm. An Environmental Incident Form shall be completed for any environmental incidents. All environmental incidents shall be classified as non-conformances and corrective action initiated. Variations in Groundwater Quality In the event that variations in groundwater quality are greater than 10% of the established baseline levels, further investigations shall be undertaken by a suitably qualified consultant in consultation with Council and the EPA to determine the source of contamination and the requirements for remedial actions. MONITORING: This EIMP element shall be continually reviewed and maintained to ensure that the best possible contingency situation management procedures are in place. REPORTING: Operators shall submit monthly reports to Council during construction and establishment phases providing details of any environmental incidents and emergencies and corrective actions undertaken. The Principal shall report any emergency situations to the EPA as soon as is practicable after the emergency situation occurs. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.