Council archive · source document
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 I ) NOOSA NORTH SHORE ECO-TOURISM PORTAL Cc Cardno CORRECTIVE ACTION: Should there be non-compliance with the stated performance indicator the following corrective actions are to be implemented. e Identification of the cause of the non-compliance; e Implementation of appropriate mitigation measures as determined by the Operator in consultation with the Principal; and e Relevant validation monitoring to confirm that the nominated corrective actions have been effective. The Operator shall implement the corrective action(s) as required within the agreed time frame noted on the CAR. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.