Council archive · source document
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 ) NOOSA NORTH SHORE ECO-TOURISM PORTAL q Cardno 2: PROPOSED SEWAGE TREATMENT PLANT 2:1 Design Flows The predicted volume of wastewater requiring treatment for Stages 1 to 4 of the proposed development at full occupancy has been estimated as 67.6 kL/day. This is based on a total EP of 483 following completion of Stage 4 of the proposed development and a rate of 140L/EP/day. The STP will initially be constructed to provide treatment facilities and disposal by irrigation for the wastewater generated from Stage 1 of the development. This will comprise a design loading of 15.6kL/day. A second module will be added to the STP at an appropriate time to treat wastewater generated from Stages 2 to 4 of the development. Table 1 below shows the design occupancy rates and wastewater flow rates for the two phases of the STP construction. Table 1: Design Flows to STP Development Stage Equivalent STP Design Persons (EP) | Loading (kL/day) Stage 1 112 15.6 Stages 2 to 4 371 52.0 Total 483 67.6 2.2 STP Design and Operation The STP proposed for installation at the site is a membrane bioreactor with submerged ultra-filtration membrane (Clearstream SBMBR). The filtration membranes remove microorganisms and most suspended solids from wastewater to produce a high quality effluent suitable for use as low grade process water or for irrigation purposes. Nitrogen removal is achieved through nitrification and denitrification processes. Phosphorous removal from wastewater is achieved by two processes: (a) chemical precipitation and removal by solids separation and; (b) enhanced biological phosphorous removal through uptake by microorganisms and biosolid removal, processing and disposal or reuse. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.