Skip to the record
Every meeting, every word.

Council archive · source document

Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 « > Cardno

NOOSA NORTH SHORE ECO-TOURISM PORTAL

 

The Clearstream SBMBR produces effluent of Class A+ standard. The quality of
treated effluent produced by the system is given in Table 2 below.

Table 2: Clearstream SBMBR Effluent Quality

 

 

 

 

 

 

 

 

 

 

Parameter Quality
Biochemical Oxygen Demand < 10mg/L
Suspended Solids < 10mg/L
Faecal coliforms (E. Coli) < 10 cfu/100mI
Total Nitrogen < S5mg/L

Total Phosphorous < img/L
Turbidity <2NTU

 

Management measures for operation and maintenance of the STP are outlined in the
Sewage Treatment Site-Based Management Plan (SBMP) prepared for Stage 1 of the
development. This SBMP provides details of effluent quality monitoring and
performance criteria.

 

Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006
1\\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 3

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.