Council archive · source document
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 « > Cardno NOOSA NORTH SHORE ECO-TOURISM PORTAL The Clearstream SBMBR produces effluent of Class A+ standard. The quality of treated effluent produced by the system is given in Table 2 below. Table 2: Clearstream SBMBR Effluent Quality Parameter Quality Biochemical Oxygen Demand < 10mg/L Suspended Solids < 10mg/L Faecal coliforms (E. Coli) < 10 cfu/100mI Total Nitrogen < S5mg/L Total Phosphorous < img/L Turbidity <2NTU Management measures for operation and maintenance of the STP are outlined in the Sewage Treatment Site-Based Management Plan (SBMP) prepared for Stage 1 of the development. This SBMP provides details of effluent quality monitoring and performance criteria. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.