PEREGIAN BEACH ACTIVE STREET - STAGE 1 PROGRESS UPDATE AND NEXT STEPS (Deferred from the General Committee Meeting dated 16 March 2026) · Report

of 16

Page text shows just the words. Original shows the document exactly as it was published.

ORDINARY MEETING                                                                     19 MARCH 2026



Current Project Program
The current program, not accounting for any further delays as a result of this report, narrowly meets
the critical project construction end date of 30 June 2027. With no remaining float/program
contingency, this is a significant risk for the project.

Table 1 below indicates current forecast milestone dates as per the project program.

Milestones                              Deadline
Council S&O Decision                    10 March 2026
IFC Design                              30 March 2026
Award Tender                            27 May 2026
Practical Completion                    22 April 2027
Handover – final report & funding claim20 May 2027
Table 1: Program Milestones

Program risk mitigation - extension of time
Anecdotal advice received from ATF and SEQ Liveability Funding authorities have indicated that
both would be amenable to an extension of time request provided clear rationale is included in the
submission. The project team is working through extension of time requests with the grant funding
bodies.

The full program, including additional project consultation activities contributing to the extension of
time required is provided at attachment 8.

4. Community Engagement Findings

From March 2025 to February 2026, the Peregian Beach Active Street Project team undertook
targeted community engagement throughout the concept and detailed design stages, focusing on
residents of South Peregian as well as key community and stakeholder groups. Wider community
consultation on previous planning studies is provided in the ‘Background and Strategic Foundations’
section of the report. Project specific engagement activities are summarised below:

Activity Type Description
Councillor
               Multiple workshops and briefings (14 March, 7 April, 18 August ‘25)
Briefings
               Dedicated page created 8 April ‘25 with project updates, FAQs,
Project
               Project News, and a document repository including case studies,
Webpage
               educational videos and traffic and corridor studies.
Direct         Letterbox drops, direct mail, and digital notifications to residents and
Notification   stakeholders
Public    town
               Peregian Beach Community Road Safety Forum (13 May 2025)
hall meetings
               Boreen Point Ordinary Meeting (20 Nov 2025)

Public Pop-    Concept design stage (17 & 30 April ’25)
Ups            Developed design stage (21 & 29 Jan ’26)
Walkshop       Site-based review of detailed design (18 Feb ’26)
Log in to download the original file

Report.pdf · 289 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.