38. Pram ramps shall be installed wherever needed to direct pedestrians across the road and at
the roundabout, but the gaps in the islands shall be at road surface level and without ramps.
39. All paths, pram ramps, driveways and parking areas shall be designed and constructed to
ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish.
40. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
41. The developer shall provide a safe connection (minimum width 2.5 metres) for pedestrians
and cyclists from Eumundi Noosa Road and Gateway Drive into the development site and
include any necessary pedestrian refuges or crossings required. The alignment shall ensure
that appropriate path design standards can be met and pedestrians and cyclists have safe
passage through the car park area to the customer and staff entrances.
Power
42. The applicant shall be responsible for the relocation of all power services required to be
moved as a result of the works associated with this development.
Environmental Management Plan
43. An Environmental Management Plan shall be submitted to Council in conjunction with any
Operational Works application addressing:
43.1. Construction Management including:
43.1.1. Erosion and Sediment Controls;
43.1.2. Traffic Management;
43.1.3. Dust and Noise nuisance;
43.1.4. Haulage Routes.
43.2. Acid Sulfate Management; and
43.3. Operational Surface Water Management.
Roof Water & Stormwater Drainage
44. Roof runoff from any new building shall be directed to a rainwater storage system or tank that
is installed to ensure water from the tank is used for external uses (such as watering gardens,
irrigation, ornamental ponds, water features, outdoor cleaning, etc) and for use in flushing of
toilets internal to the building. All rainwater tanks are to be designed and installed in
accordance with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and
shall be part of the plumbing application in conjunction with the building approval. The
location and capacity of the tanks shall be in accordance with the approved Surface Water
Management Plan (SWMP) and be clearly shown on the plans submitted for Operational
Works approval and any overflow shall be directed as required by the SWMP.
45. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site.
46. Stormwater drainage permitted to drain from the site shall be discharged to Council’s existing
drainage structures in Gateway Drive. If required, the applicant shall upgrade the existing
drainage system. Plans of the drainage design shall be prepared by a Registered
Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit
for Operational Works. A Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued in regard to the drainage
scheme.
Page 6 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00000256.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 98 KB (small file)
- File type
No other editions are linked here.