                                                                                        2007/256



47.   As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed or
      overland flowpaths created within the site to collect and discharge stormwater runoff from all
      adjoining properties to prevent additional ponding/flooding on these properties.
48.   All site stormwater drainage shall be by means of a gravity system.
49.   All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
      circuit television (CCTV) prior to commencement of the approved Use.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
      following satisfactory completion of construction works. The developer will be responsible for
      the full cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification. This charge is payable prior to the issue of Operational Works
      approval and will be determined on the unit rate basis current at the time of approval.

Surface Water Management
50.   To ensure that polluted run-off does not enter Council’s stormwater drainage system or the
      downstream ecosystem, stormwater run-off from the carparking areas and the driveways shall
      be treated in accordance with an approved Surface Water Management Plan. The Cardno
      Surface Water Management Plan dated 8 February 2008 shall be amended to reflect the
      conditions of this approval and the modified layout approved herein. It shall also ensure that
      there is a requirement for monitoring to be undertaken for a period of three years after the
      commencement of the use and the results submitted for Council for their records in digital
      form. The amended plan shall also include a method to effectively remove trash from the
      stormwater system. Rectification measures for non-compliance with water quality objectives
      shall be included in the Environmental Management Plan.
51.   The amended Surface Water Management Plan shall demonstrate that the ecosystem located
      downstream will not be adversely affected by water harvesting and detention proposed.
Sewer Mains
52.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
      This may require the construction of sewer mains external to the site to connect to an
      approved connection point.
53.   Any existing sewer mains that traverse the site and are no longer required shall be removed
      and capped in accordance with Council’s requirements.
Town Water Supply
54.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
55.   The water connection to the water reticulation system shall extend to the property boundary
      and be metered. All fees for the supply of water meters shall be paid to the Council.
56.   The water meter must be located outside the property boundary and in an easily assessable
      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
      readers, and not behind fences or locked gates. In this regard approval of the water meter
      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
      Manager prior to lodgement and approval of hydraulic drawings.
Earthworks
57.   Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
      Engineering Design Standards Manual and so as not to cause the additional ponding of water
      on any adjoining lands or the blockage of, or interference with, any natural watercourses.
      Detailed site surveys indicating natural surface levels and contours of the adjoining properties
      must be provided with the application for a Development Permit for Operational Works for
      Filling and Drainage.
                                                                                     Page 7 of 19

Used in these records

About this file

File size
98 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00000256.001 [As Published].pdf · 98 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.