Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Attachment 3 Soil Test Report

Attached to the e-mail MCU15/0045 Application for Detached House - Soil Test & SWMP - Email 2 of 2.

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

D.2 Site Drainage recommendations

 

 

 

 

 

 

 

 

 

 

          

     

‘CUT-OFF DRAIN AT HGH
SUE CF EMBANKMENT os

|
'

CUT-OFF ean ach
HGH SDE ra
RETAMING Se me
\
Ne ll

| GROUND SURFACE FAL

FOOTING & 41:20 WN FOR Sm NIB

AB HAD

 
   
  

REAR OF WALL DRAINAGE,

 

© PROWDE FLUSH OUT
: FACLITY
' CUT-OFF ORAN AT BASE
CUT-OFF GRAN AT TOE OF RETANING WALL
OF EMBANKMENT QUT
OWRECTED AROUND THE
ORECTED AROUND THE PERWETER OF THE
PERIMETER OF THE OWELUNG
DWELLING
~
TPICAL DRAINAGE ~ CUT FILL SITE

        

ite to drain
i flooding of foundation works, temporary sumoing
drainage paths are trapoed. Temporary down pipes must
'ed foliowing roof construction and drained away from the construction area.
Drainage trenches shou d be clay cagned to stop me
2, Upon comple ad surroundir

          

 

dramed ia agoroved drainage fa
3, Rear of waa

SITE DRAINAGE RECOMENDATIONS ALL SITES

 

 

 

SCG Consulting Engineers Appendix Page 6 of 6 Appendices.1
Log in to download the original file

Attachment 3 Soil Test Report.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.