Original source · versioned page text
Attachment 3 Soil Test Report
Attached to the e-mail MCU15/0045 Application for Detached House - Soil Test & SWMP - Email 2 of 2.
D.2 Site Drainage recommendations
‘CUT-OFF DRAIN AT HGH
SUE CF EMBANKMENT os
|
'
CUT-OFF ean ach
HGH SDE ra
RETAMING Se me
\
Ne ll
| GROUND SURFACE FAL
FOOTING & 41:20 WN FOR Sm NIB
AB HAD
REAR OF WALL DRAINAGE,
© PROWDE FLUSH OUT
: FACLITY
' CUT-OFF ORAN AT BASE
CUT-OFF GRAN AT TOE OF RETANING WALL
OF EMBANKMENT QUT
OWRECTED AROUND THE
ORECTED AROUND THE PERWETER OF THE
PERIMETER OF THE OWELUNG
DWELLING
~
TPICAL DRAINAGE ~ CUT FILL SITE
ite to drain
i flooding of foundation works, temporary sumoing
drainage paths are trapoed. Temporary down pipes must
'ed foliowing roof construction and drained away from the construction area.
Drainage trenches shou d be clay cagned to stop me
2, Upon comple ad surroundir
dramed ia agoroved drainage fa
3, Rear of waa
SITE DRAINAGE RECOMENDATIONS ALL SITES
SCG Consulting Engineers Appendix Page 6 of 6 Appendices.1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.