Attachment 3 Soil Test Report

Attached to the e-mail MCU15/0045 Application for Detached House - Soil Test & SWMP - Email 2 of 2.

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

D DETAIL SHEETS
D.1

Plumbing Requirements Class M, H1, H2 & E Sites

 

NTS.

 

WIS

SLEEVED OR EXPANDA tn
TH A WNIMUN OMERUP OF
(SOkmm BNR AS SHOWH

GROUND \

71:20 MN

‘STORM WATER
DRANACE PIPE
\

KES.

 

 

STORWPRATER OOWFPE

SURFACE FALL,

ALLOW PIPE BORK TO OYE /
‘VERTICALLY INDEPENDENT
OF BULONG FOOTNCS

TYPICAL STORM WATER DETAIL

SLAB POEIRATONS iN TO SATISFY
TERMITE PROTECTION REQUIREMENTS

   

 

FOR SLABS SUPPORTED ON PIERS
PROWE STAINLESS STEEL

‘SUSPENSION STRAPS FRM LAS
MESH TO UNOERSLAR ORANAGE,

 

 

 

 

 

 

FOOTING PENETRATION
ACCORGANCE WITH FOOTING
+ AND SLAB DETALS:

 

| Foonwe &
= 98

 

 

 

y

 

Ets
(EPu)}

 

 

| | (GAYS 10 wR APE
CONNECTOS GLASS H &

LEGEND.

SELECTED N-UNE “DPANOA’ ONT INSTALLED 70
MANUFACTURERS SPECIFICATIONS. STORMPLASNCS OR
EQUALLY APPROVED

(SW) SELECTED IN—UNE SHNEL WONT INSTALLED 10
WANUFACTURERS SPECACATIONS. STORMPLASICS OR
EQUALLY APPROVED

(CTP)  COMPACTED CLAY PLUMEANG TRENCH PLUG TO STOP
MOISTURE ENTERNG UNDER HE HOUSE SLAB

(SHL) SEWER MAN UNE

10. INSPECTION OPENING 10 SURFACE

UGGNG —-MINNUN LAGGNG THICKNESS, 20mm FOR CLASS

‘STES ANG 40mm KR CLASS H & € SITES

Guidelines for Drainage Installations

 

water Charged and where soll movement may effect the p:
plan and soecification should be providea by an aoproy

 

calculations showing oregosed method to protect the drainage from potential ground
movements may de required,

    

are to be
provided to accommodate movement in
comply AS71260.

3. Plumbing and drainage under the slab should be avoided where oract
AS/N253500 clause 4.
4, Grades in pipe work on M, Hand E sites should have a minimum grade of 1:50 within $5
matres of the building and 1:60 elsewhere. Grades in fe {ings to be set at the
minimum grade

5. All expansion and artic
recommencations. All
cirectica.
6, Stormplas

 

 

 

5 10 be installed in accordance with manufacturer's
ints to 5¢ set mid point so as to allow for maximum in either

s (SA) Pty Lcd ‘sui

       

movement. A minimum 15° bend to be installed before swivel
qrades From the face of the foot

7. Detail and supeort of
movements including isolation and a’

 

‘h the footing system on class Hand E

   
     

PVC pipe products is not permitted
in accordance AS3660 and is not showm cn these d

 

fixtures such as HWS and A.C. to approved drains as required by tl
authority.

relevant ‘acai

PLUMBING REQUIREMENTS — CLASS M Hi H2 & E SITES

 

 

SCG Consulting Engineers

Appendix Page 5 of 6

Appendices.1
Log in to download the original file

Attachment 3 Soil Test Report.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.