Original source · versioned page text
Attachment 3 Soil Test Report
Attached to the e-mail MCU15/0045 Application for Detached House - Soil Test & SWMP - Email 2 of 2.
Site Classification: The site classification is calculated in accordance with the “AS2870-2011 - Residential Slabs and Footings- Construction” and relates to the estimation of Ys, “The characteristic surface movement’ within reactive soil profiles. The limits used for this classification are as follows: Predicted Surface Movement Classification Ys = <=20mm $s ight Ys = >20-40mm M Moderate Ys = >40- 60mm H1 High-1 Ys = 60— 75mm H2 High-2 Ys => 75mm EA Extreme Problem sites iP Problem C.2 Recommendations for Owners Foundation Maintenance and Owners Responsibilities: The soils surrounding and under the foundations must be protected from scour or washout from stormwater by ensuring adequate drainage as noted above. Localised concentrations of moisture such as overflows from hot water cylinders or air conditioners can lead to excessive localised foundation movements and must also be adequately drained away from the foundations as noted above. in all types of soil conditions, if an automatic watering system irrigates within 2.5 meters of a foundations, instability problems and excessive foundation movements are likely to occur. Also site drainage as discussed above must be maintained. Ongoing foundation maintenance is documented in the CSIRO handout BTF-18, attached to the client's copy of this report. (Additional copies available upon request.) Refer to the attached detail sheet “General Requirements for Site Drainage” Additional Requirements - Class A & S Sites: Trees and dense shrubs must be kept well away from the building foundations. Refer to the following section “Recommendations — Builders/Owners ~ Trees”. In all types of soil conditions, if an automatic watering system irrigates within 2.5 meters of a footing, instability problems may occur. Water should not be allowed to pond on the ground near the building. Finished surface grades around the building should also ensure scour of soils cannot occur. Additional field gullies and drainage might be required. In all instances the ground should be sioped away from the foundations at a grade of no less than 1 in 20 (vertical to horizontal) for at least 1.5m. Additional Requirements - Class M, H & E Sites: Trees and dense shrubs must be kept well away from the building foundations. Refer to the following section “Recommendations — Builders/Owners — Trees’. ing should be protected against the increased moisture that occurs in gardens or permeable landscaping built adjacent the foundations. Automatic irrigation systems must not be used adjacent structural foundations. If required, these forms of landscaping must be constructed over impermeable membranes that drain the excessive moisture away from the founda’ to correctly installed field gullies and drains. We strongly recommend the construction of hard landscaped paths or terrace slabs adjacent building foundations for at least a distance of 1.5m to protect the foundations from excessive moisture. C.3. Recommendations — Builders/Owners - Trees Trees and landscaped gardens can have a dramatic influence over the moisture content of the soils they are grown in. This can lead to increased soil movement through shrinking and swelling. Where these trees or gardens are within close proximity of structural foundations the soil movements can affect the structural integrity of the foundations. For Class M, H and E sites the follo 1g recommendations for the minimum distance between trees and footings should be followed:- Site Class Offset to Tree Class M : 0.75 xh Class H : 1.0 xh Class E : 15 xh Where ‘h’ is the mature height of the tree, further refinement of this recommendation can be pursued where tree species can be considered. Where a row or group of trees exists the above recommendation should be doubled. In some instances the installation of root barriers can lessen the effect of trees on foundation performance. Please contact SCG Consulting Engineers for options. The following table provides some guidance on mature tree heights:- APPROXIMATE TREE HEIGHTS 10 to 20m Height — Acacias, Ash, Athe! Tree, Candlebark, Manna Gum, Pepper Tree, Willows, Yate, Yellow Gum 20 to 30m Height — But-But, Cedars, English Oak, Lemon Gum, Palms, Planes, Sheoaks, Silky Oak, Spotted Gum, Casuarina 30 to 60m Height — Blue Gum, Cypress, English Elm, Figs, Karri, Pines, River Gum, Sugar Gum The removal of trees from the proposed construction can also greatly affect the moisture conditions of the soil. We recommend allowing the ime to reach moisture equilibrium prior to construction commencing. Please contact our office for further guidance on this matter. SCG Consu! IS} Engineers Appendix Page 4 of 6 Appendices.1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.