Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2017-11-16 Ordinary Meeting Agenda

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                  16 NOVEMBER 2017


        24.   All easements must be designed in accordance with the planning scheme and
              granted at no cost to the Grantee. Where the Grantee is Council or a service
              authority, the easement documentation must be in accordance with the
              Grantee’s standard easement terms. Draft easement documentation must be
              submitted to Council for endorsement.
        25.   All works must be kept clear of any existing or proposed easements on the
              subject land, unless agreed otherwise in writing by the Grantee.
              Earthworks and Retaining Walls
        26.   All fill and associated batters must be undertaken in accordance with an
              Operational Works approval, and contained entirely within the subject site
              unless written permission from the respective landowner(s) is provided to
              Council.
        27.   All retaining walls must be designed and constructed in accordance with the
              planning scheme and must be certified by an RPEQ where exceeding 1.0m in
              height. All retaining walls that are publicly accessible and exceed 1.0m in height
              must be fitted with a commercial grade safety fence.
              Damage to Services and Assets
        28.   Any damage caused to existing services and assets as a result of the
              development works must be repaired at no cost to the asset owner at the
              following times:
              a.   where the damage would cause a hazard to pedestrian or vehicle safety,
                   immediately; or
              b.   where otherwise, upon completion of the works associated with the
                   development.
              Any repair work which proposes to alter the alignment or level of existing
              services and assets must first be referred to the relevant service authority for
              approval.
              Landscaping Works
        29.   The development site must be landscaped prior to the commencement of use.
              The works must be undertaken in accordance with an Operational Works
              approval and the Noosa Plan for that specific area and must include in
              particular:
              a.   the landscape areas shown on the approved Site Plan/Floor Plan
                   prepared by Andrew McKellar Design dated 14.06.2017.
              b.   a minimum 2-metre-wide landscaping strip along the Ernest and Hilton
                   road frontage of the subject site, exclusive of the access driveway,
                   generally uncompromised by infrastructure items.
              c.   Any retaining walls must be setback from the front boundaries as shown
                   on the Approved Plans and screened with landscaping. Landscaping
                   plans must clearly show any retaining structure and adequately
                   demonstrate how these structures will be permanently screened with
                   native vegetation.
              d.   all letterboxes located inside the development or in a position which does
                   not visually dominate the frontage.
              e.   details of the rendered wall finish on the Hilton terrace frontage, which
                   can include stone facing or other natural looking finishes and complement
                   the proposed landscaping.




                                                                                 Page 19 of 45
Log in to download the original file

2017-11-16 Ordinary Meeting Agenda(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.