              f.    sub-terrain tree planting area demonstrating at least 4m³ area of
                    structured soils per tree is available for root growth and is not subject to
                    compaction.
              g.    Provision of 100L Melaleuca quinquenervia along the frontage.
              h.    Details and depths of all landscaping soils, especially where subject to
                    compaction relating to filling of the site.
              i.    Plant selection generally as shown on the landscape documentation.
              j.    Bio-basin landscape plants must include a mixture of at least five of the
                    following species for planting in the bio-retention basin extended
                    detention surface at a minimum density of 8 plants/m²:
                    i.    Carex appressa
                    ii.   Carex fascicularis
                    iii.  Ficinia nodosa
                    iv.   Juncus usitatis
                    v.    Lomandra longifolia
                    vi.   Ghania sieberiana
        30.   All landscape works must be established and maintained in accordance with
              the approved design for the life of the development, and in a manner that
              ensures healthy, sustained and vigorous plant growth. All plant material must
              be allowed to grow to full form and be refurbished when its life expectancy is
              reached.
        31.   All landscape works must be maintained generally in accordance with the
              approved design for the life of the development.
              Stormwater Drainage
        32.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval and be generally in accordance with the submitted
              Stormwater Management Plan - Revision A dated 19 April 2017, prepared by
              Switchback 48 Consulting.
        33.   Stormwater runoff from the development must be disposed of on-site without
              causing scour or damage to the subject site or any adjoining property. Plans
              submitted for the Operational Works approval must include calculations in
              accordance with Queensland Urban Drainage Manual for any overland flow
              discharge areas to confirm that scour will not result from the development.
        34.   A stormwater quality treatment system must be provided for the development.
              The works must be undertaken in accordance with an Operational Works
              approval and the Bio-retention Technical Design Guidelines (Water by Design,
              2012), and must include in particular:
               a.   stormwater quality treatment devices of a size and location of 30m2 plus
                    25m2 generally in accordance with those shown in section 2 of the of the
                    Stormwater Management Plan for 11-19 Hilton Terrace Tewantin by
                    Switchback Consulting, dated 19 April 2017.
               b.   Bio-retention devices which:
                    i.    are designed generally in accordance with the Water by Design
                          Technical Design Guidelines for bio-retention basins
                    ii.   are provided with a free-draining outlet from the sub-soil drainage
                          system



                                                                                 Page 20 of 45
Log in to download the original file

2017-11-16 Ordinary Meeting Agenda(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.