Original source · versioned page text
2017-11-16 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 16 NOVEMBER 2017
c. Any other matters necessary to prevent the oxidation of potential acid
sulfate soils or release of Acid Sulfate Soil related water contaminants.
41. All waters, including stormwater runoff, groundwater seepage and leachate
from acid sulfate soils must achieve the following quality prior to release from
the site:
a. a pH range of 6.5-8.5 pH units
b. 50mg/L maximum total suspended solids concentration
c. 0.3mg/L maximum total iron concentration
d. 0.2mg/L maximum total aluminium concentration
e. no visible plume at either the point of release from the site or within a
waterway
Waste Disposal
42. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
Commercial and Industrial Premises”. The facilities must include an external
impervious area correctly sized for all refuse and recycling containers and
suitably screened from public places and neighbouring properties. A bin wash
area is required with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet must be designed to prevent storm
water entry to the sewerage system.
43. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste
Management) Regulation 2000, for the storage and collection of refuse.
44. Public bins must be provided throughout the car park to reduce littering. Bins
provided must be for refuse and recycling and be decanted into the bulk bins by
the site operators.
B. Enter into an Infrastructure Agreement with the applicant that provides for the
acquisition of part of the site, compensation for this land acquisition, frontage works
being undertaken by Council, demolishing of the existing building and car parking in
lieu of 8 on-site car parking spaces.
6 ASSET MANAGEMENT AND DESIGN SERVICES TEAM RESOURCING
ARRANGEMENTS
That Council note the report by the Asset Planning Manager and Infrastructure Planning,
Design and Delivery Manager to the General Committee Meeting dated 13 November 2017
and approve changes to Council’s organisational structure as detailed in the report.
7 FINANCIAL PERFORMANCE REPORT - OCTOBER 2017
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 13 November 2017 outlining the October year to date financial performance
against budget.
Recommendation
The General Committee recommendations dated 13 November 2017 be adopted except where
dealt with or held over by separate resolution.
Page 22 of 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.