Original source · versioned page text
2017-11-16 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ATTACHMENT 2
Page 31 of 45
Noosa Shire Council
2017/18 Budget Review 2 - Capital Submissions ATTACHMENT 2
For the period ending 30 June
Program Project Description eT a mes aay bere a siete 48 Pte s Proposed
TV Te [otha
Semen Renanet nn penseeepnent
Asset Management Tewantin Administration Building Air Handling Unit Project delayed pending Tewantin building master Expense $ 35,000 -$ 30,000 $ 5,000
toh |
Total
RT prestolonnggantsuces
Bridges Mary River Road Bridge, Cooroy Reallocation from bridge program to individual bridge Expense $ 401,350 $ 401,350
ET pecs along genius
Old Noosa Road Bridge, Cooran Reallocation from bridge program to individual bridge Expense $ 254400 $ 254,400
ENR TEER pce along gensvcats |
Orealla Court Overpass, Sunrise Beach Reallocation from bridge program to individual bridge $ 33,600 $ 33,600
_Weyba Creek Bridge deck joints = === Scope increase to align with reseal program. ss Expense = $ = - S$ 60,000 $__60,000
eee eee ere pce olowng grant svete nee 8 SENS NO
projects following grant success
Bridges Total $1,500,000 -$ 750,650 $749,350
wage igen eee [poem [FB ee
FE ee
Waterways Program
Seahaven Rock Wall Works required to minimise impact of sand blow on Expense $ 43,550 | $ 43,550
project.
weeremetot ||
Waterways Total
Community Facilities __Cooroy Library Lighting Refurbishment = Project completed under budget. = = Expense = $ 83,044 -$ 20,000 S$ 63,044
eee eee
Noosaville Library Refurbishment Refurbishment brought forward due to grant funding Expense $ 47,947 $ 1,065,180 $ 1,113,127
fob |e
Total
— eee Banseeepnent ee
Corporate Buildings Doonella House - Emergent Works Project delayed pending Tewantin building master Expense $ 60,000 |-$ 60,000
fw |
Total
fmee Ecrcecean tance [PO
Fleet - Plant Council Fleet and Plant Replacement Additional funding for vehicles associated withnew Expense $ 1,450,000 $ 118,087 $ 1,568,087
Replacement positions (2 utes, 1 sedan) and 1 additional pool
Rmmmertto | | Tl
Replacement Total
Sections - D+C (Donnelly's)
ee ere evant Black Mountanlandsipprjet
revegetation of Black Mountain landslip project
fot |
Total
Page 31 of 45See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.