Budget
Pomona Stan Topper Park Bollard Installation _—_— Project completed under budget. 7 Expense | $ 50,000 -$ 15,000 $ 35,000 |
Sunshine Beach Skate Park Renewal - Construction Prior approved funding not included in BR1 Bepense | $ 211,008 $ 189,350 $ 400,000 |
Phase 2 of 2
| ‘Tewantin, Jacaranda Park Emergent works _ Expense $ -_ ($ 90,000 $ 90,000 ©
‘Renewal of revetment wall at O-Boats Gympie Tce, Emergent renewal works ‘Expense = $ - $ 225,000 $ 225,000.
Noosaville |
‘BBQ renewals along Gympie Terrace Emergent renewal works Expense $ - $ 18,525 $ 18,525
Parks & Playgrounds $ 261,008 $ 788,525
Total
Pathways & Enabling | Noosa Heads Main Beach Boardwalk Sails Link renewal Design costs. Project deferred to 2018/19 budget to Expense $% - $ 25,000 $ 25,000
Facilities Yr2of2 “ with private works adjacent to site August 2018.
CNN NN SSS. SSS SSS as eo eee eee |
Noosa Heads Park Road Boardwalk Renewal Budget reduced to reflect timing of delivery (2018 Expense $ 6,993,573 -$ 5,524,193 $ 1,469,380
‘Construction ‘calendar year commencement)
Pedestrian Bridge renewal at Alec Loveday Park, Emergent renewal works Expense $ - $ 22,000 $ 22,000
‘Tewantin
ne fj}
Boardwalk renewal at Gympie Tce, Noosaville ‘Emergent renewal works Expense $ - $ 31,000 $ 31,000
‘Pathway renewal at Elm St, Cooroy (train to school) § Emergent renewal works [eave /$ - |$ 13,000 $ 13,000
ft eee sj}
oo renewal at David Low Way -Castaways Beach Ce renewal works Expense $ - |$ 20,000 $ 20,000
Pathway renewal at Goodwin Street-Tewantin ~ Emergent renewal works Expense $ - |$ 24000 $ 24,000.
He Rp ____i
Pathway renewal at Pacific Av - Sunshine Beach - Emergent renewal works Expense $ - $ 9,000 $ 9,000
‘Hotmix path to be removed and replaced with concrete
|
wa i TOTO"
Pathway
5 1 1 1 29 2 823 1324 110 24 96 renewal
5 1 1 1 29 3 945 1325 27 23 96 at
5 1 1 1 29 4 982 1323 109 32 96 Gympie
5 1 1 1 29 5 1101 1323 112 25 96 Terrace
5 1 1 1 29 6 1500 1323 148 32 52 Emergent
5 1 1 1 29 7 1659 1323 110 25 95 renewal
5 1 1 1 29 8 1779 1324 84 24 96 works
5 1 1 1 29 9 2293 1323 124 32 86 Expense
5 1 1 1 29 10 2477 1323 16 27 71 $
5 1 1 1 29 11 2628 1337 10 4 91 -
5 1 1 1 29 12 2691 1323 35 29 83 |$
5 1 1 1 29 13 2808 1323 98 29 77 93,883
5 1 1 1 29 14 2941 1323 17 28 76 $
5 1 1 1 29 15 3041 1323 98 30 86 93,883
5 1 1 1 29 16 3155 1327 2 23 0 -
4 1 1 1 30 0 318 1355 2839 14 -1
5 1 1 1 30 1 886 1348 43 25 35 nnn
5 1 1 1 30 2 928 1355 2229 14 31 nnd
4 1 1 1 31 0 683 1369 2455 32 -1
5 1 1 1 31 1 683 1370 130 31 58 ‘Pathway
5 1 1 1 31 2 823 1370 110 24 95 renewal
5 1 1 1 31 3 945 1371 27 23 96 at
5 1 1 1 31 4 981 1370 94 25 95 James
5 1 1 1 31 5 1086 1369 36 30 95 St,
5 1 1 1 31 6 1136 1370 146 24 95 Noosaville
5 1 1 1 31 7 1501 1370 147 31 60 Emergent
5 1 1 1 31 8 1659 1370 110 24 96 renewal
5 1 1 1 31 9 1779 1370 84 24 95 works
5 1 1 1 31 10 2285 1370 132 31 29 ‘Expense
5 1 1 1 31 11 2459 1369 34 28 29 $
5 1 1 1 31 12 2628 1383 10 4 92 -
5 1 1 1 31 13 2709 1369 17 28 93 $
5 1 1 1 31 14 2808 1370 98 29 93 25,000
5 1 1 1 31 15 2941 1369 17 28 90 $
5 1 1 1 31 16 3041 1370 97 29 96 25,000
4 1 1 1 32 0 325 1415 2814 33 -1
5 1 1 1 32 1 325 1416 148 32 93 Pathways
5 1 1 1 32 2 483 1416 23 25 93 &
5 1 1 1 32 3 517 1416 134 32 96 Enabling
5 1 1 1 32 4 2476 1415 18 29 92 $
5 1 1 1 32 5 2530 1416 144 30 96 6,993,573
5 1 1 1 32 6 2941 1415 17 30 91 $
5 1 1 1 32 7 2997 1416 142 30 92 1,732,263
4 1 1 1 33 0 325 1458 223 26 -1
5 1 1 1 33 1 325 1458 137 26 96 Facilities
5 1 1 1 33 2 472 1458 76 26 96 Total
4 1 1 1 34 0 325 1545 2813 32 -1
5 1 1 1 34 1 325 1546 124 31 96 Planning
5 1 1 1 34 2 460 1545 118 26 96 Scheme
5 1 1 1 34 3 690 1545 44 26 96 Six
5 1 1 1 34 4 744 1546 57 24 96 Mile
5 1 1 1 34 5 811 1545 85 26 96 Creek
5 1 1 1 34 6 908 1546 78 24 96 Flood
5 1 1 1 34 7 997 1545 82 32 96 Study
5 1 1 1 34 8 1500 1546 108 31 40 ‘Project
5 1 1 1 34 9 1618 1546 148 31 96 completed
5 1 1 1 34 10 1778 1546 82 24 96 under
5 1 1 1 34 11 1870 1546 105 31 96 budget.
5 1 1 1 34 12 2293 1546 124 31 86 Expense
5 1 1 1 34 13 2477 1545 16 28 58 $
5 1 1 1 34 14 2560 1546 113 29 88 116,063
5 1 1 1 34 15 2698 1545 28 28 88 -$
5 1 1 1 34 16 2807 1546 99 28 85 45,683
5 1 1 1 34 17 2941 1545 17 28 85 $
5 1 1 1 34 18 3041 1546 97 29 96 70,380
4 1 1 1 35 0 325 1593 2814 33 -1
5 1 1 1 35 1 325 1594 135 32 96 Planning
5 1 1 1 35 2 470 1594 124 26 96 Scheme
5 1 1 1 35 3 2476 1593 18 30 90 $
5 1 1 1 35 4 2559 1594 114 31 79 116,063
5 1 1 1 35 5 2698 1593 28 30 80 -$
5 1 1 1 35 6 2807 1594 100 31 88 45,683
5 1 1 1 35 7 2941 1593 17 30 90 $
5 1 1 1 35 8 3040 1594 99 31 67 70,380
4 1 1 1 36 0 324 1637 76 25 -1
5 1 1 1 36 1 324 1637 76 25 96 Total
4 1 1 1 37 0 325 1679 2813 32 -1
5 1 1 1 37 1 325 1679 98 26 96 Sealed
5 1 1 1 37 2 436 1680 90 25 96 Roads
5 1 1 1 37 3 538 1680 116 25 88 Network
5 1 1 1 37 4 683 1680 84 29 88 Black
5 1 1 1 37 5 779 1680 130 25 96 Mountain
5 1 1 1 37 6 921 1680 75 25 96 Road
5 1 1 1 37 7 1008 1680 99 31 96 Priority
5 1 1 1 37 8 1117 1679 123 26 96 Sections
5 1 1 1 37 9 1251 1680 75 25 96 Road
5 1 1 1 37 10 1501 1680 99 25 67 Works
5 1 1 1 37 11 1610 1681 27 24 96 to
5 1 1 1 37 12 1647 1686 158 19 96 commence
5 1 1 1 37 13 1815 1680 63 25 92 later
5 1 1 1 37 14 1888 1680 23 25 96 in
5 1 1 1 37 15 1921 1680 118 25 96 financial
5 1 1 1 37 16 2050 1686 62 25 96 year
5 1 1 1 37 17 2293 1680 124 31 83 Expense
5 1 1 1 37 18 2470 1675 11 41 44 §$
5 1 1 1 37 19 2558 1680 115 29 92 510,000
5 1 1 1 37 20 2698 1679 28 28 92 -$
5 1 1 1 37 21 2790 1680 115 29 88 265,000
5 1 1 1 37 22 2941 1679 17 28 88 $
5 1 1 1 37 23 3022 1680 116 29 95 245,000
4 1 1 1 38 0 683 1700 819 59 -1
5 1 1 1 38 1 683 1717 221 42 43 Reconstruction
5 1 1 1 38 2 1501 1700 1 55 92 |
4 1 1 1 39 0 683 1762 2455 53 -1
5 1 1 1 39 1 683 1767 162 29 59 ‘Noosaville,
5 1 1 1 39 2 856 1767 104 25 96 William
5 1 1 1 39 3 972 1766 86 26 96 Street
5 1 1 1 39 4 1068 1766 102 26 95 Shared
5 1 1 1 39 5 1181 1767 73 25 95 Zone
5 1 1 1 39 6 1265 1767 125 31 96 Footpath
5 1 1 1 39 7 1501 1767 147 31 55 ‘Emergent
5 1 1 1 39 8 1657 1767 84 25 96 works
5 1 1 1 39 9 2287 1762 130 41 50 Expense
5 1 1 1 39 10 2451 1766 42 49 6 \$
5 1 1 1 39 11 2628 1781 71 33 34 =k
5 1 1 1 39 12 2709 1766 17 28 92 $
5 1 1 1 39 13 2826 1767 79 29 92 6,000
5 1 1 1 39 14 2941 1766 17 28 91 $
5 1 1 1 39 15 3058 1767 80 29 95 6,000
4 1 1 1 40 0 318 1799 2839 16 -1
5 1 1 1 40 1 318 1777 469 42 10 emma
5 1 1 1 40 2 800 1804 342 3 21 ema
5 1 1 1 40 3 1189 1805 133 1 22 em
5 1 1 1 40 4 1490 1799 19 16 21 A
5 1 1 1 40 5 1521 1804 169 3 25 a
5 1 1 1 40 6 2309 1804 297 3 11 nop
5 1 1 1 40 7 2704 1804 196 3 19 RN
5 1 1 1 40 8 2883 1777 42 42 12 ee
5 1 1 1 40 9 2937 1800 220 7 20 NLT
4 1 1 1 41 0 689 1812 2449 32 -1
5 1 1 1 41 1 689 1813 130 25 92 Tewantin
5 1 1 1 41 2 831 1813 80 31 92 Diyan
5 1 1 1 41 3 922 1813 86 26 96 Street
5 1 1 1 41 4 1018 1813 64 25 96 New
5 1 1 1 41 5 1092 1813 125 31 96 Footpath
5 1 1 1 41 6 1500 1813 159 26 41 Reallocate
5 1 1 1 41 7 1669 1813 95 31 96 design
5 1 1 1 41 8 1774 1814 75 24 96 costs
5 1 1 1 41 9 2293 1813 124 31 81 Expense
5 1 1 1 41 10 2477 1812 16 28 56 $
5 1 1 1 41 11 2576 1813 97 29 92 90,000
5 1 1 1 41 12 2691 1812 35 28 92 $
5 1 1 1 41 13 2810 1813 96 29 91 11,300
5 1 1 1 41 14 2941 1812 17 28 90 $
5 1 1 1 41 15 3025 1813 113 29 96 101,300
4 1 1 1 42 0 324 1902 76 25 -1
5 1 1 1 42 1 324 1902 76 25 96 Total
4 1 1 1 43 0 325 1929 2832 49 -1
5 1 1 1 43 1 325 1945 165 26 96 Stormwater
5 1 1 1 43 2 501 1945 129 32 90 Drainage
5 1 1 1 43 3 659 1941 21 41 21 §
5 1 1 1 43 4 690 1945 168 26 54 Cootharaba
5 1 1 1 43 5 869 1945 125 25 92 Kinmond
5 1 1 1 43 6 1006 1945 38 26 96 Ck
5 1 1 1 43 7 1055 1945 75 25 96 Road
5 1 1 1 43 8 1141 1945 117 26 96 Culverts
5 1 1 1 43 9 1509 1937 67 33 96 Prior
5 1 1 1 43 10 1585 1945 133 31 93 approved
5 1 1 1 43 11 1729 1945 105 32 96 funding
5 1 1 1 43 12 1847 1947 43 23 96 not
5 1 1 1 43 13 1901 1945 118 25 96 included
5 1 1 1 43 14 2030 1945 22 25 92 in
5 1 1 1 43 15 2064 1945 57 25 84 BR1
5 1 1 1 43 16 2293 1945 124 31 44 Expense
5 1 1 1 43 17 2459 1944 34 34 51 $
5 1 1 1 43 18 2628 1959 10 4 76 -
5 1 1 1 43 19 2709 1944 17 28 91 $
5 1 1 1 43 20 2763 1945 142 29 92 2,005,000
5 1 1 1 43 21 2941 1944 17 28 92 $
5 1 1 1 43 22 2995 1945 143 29 96 2,005,000
5 1 1 1 43 23 3148 1929 9 15 83 ]
4 1 1 1 44 0 318 1983 2839 12 -1
5 1 1 1 44 1 1514 1989 763 2 0 TT.
5 1 1 1 44 2 2934 1985 223 9 0 —$$—____—___—_
4 1 1 1 45 0 683 1997 2474 32 -1
5 1 1 1 45 1 683 1998 99 26 55 Noosa
5 1 1 1 45 2 793 1998 99 29 96 Heads,
5 1 1 1 45 3 905 1998 82 24 94 Leslie
5 1 1 1 45 4 999 1998 73 24 96 Drive
5 1 1 1 45 5 1083 1997 164 26 92 Stormwater
5 1 1 1 45 6 1258 1998 138 24 92 Manholes
5 1 1 1 45 7 1509 1998 139 31 96 Emergent
5 1 1 1 45 8 1657 1998 84 24 96 works
5 1 1 1 45 9 2293 1998 124 31 86 Expense
5 1 1 1 45 10 2477 1997 16 28 44 $
5 1 1 1 45 11 2628 2011 10 5 92 -
5 1 1 1 45 12 2709 1997 17 28 88 $
5 1 1 1 45 13 2807 1998 99 29 93 40,000
5 1 1 1 45 14 2941 1997 17 28 92 $
5 1 1 1 45 15 3040 1998 98 29 70 40,000
4 1 1 1 46 0 665 2035 2492 82 -1
5 1 1 1 46 1 665 2041 172 34 32 Noosaville
Thomas Street & Gympie Tce Culverts eo costs due to latent conditions encountered Expense $ - |$ 174,950 $ 174,950.
onsite.
Six Mile Creek Catchment Flood Monitoring System [Faeieet completed under budget. e $ 257,545 -$ 32,000 $ 225,545 |
pt nnd eeaaeneneneneneenemmmnsneneemnnemel
‘Sunrise Beach, Orient Drive Drainage Slip ‘Emergent works ‘Expense = $ - $ 355,000 $ 355,000.
Page 32 of 45See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.