Skip to the record
Accept no imitations.

Original source · versioned page text

2017-11-16 Ordinary Meeting Agenda

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 32 of 45

Budget
                       Pomona Stan Topper Park Bollard Installation _—_— Project completed under budget.   7             Expense | $       50,000 -$    15,000   $     35,000 |
                       Sunshine Beach Skate Park Renewal - Construction  Prior approved funding not included in BR1      Bepense   | $    211,008  $    189,350  $    400,000 |
                       Phase 2 of 2
 |                     ‘Tewantin, Jacaranda Park                         Emergent works                                 _ Expense    $        -_  ($     90,000 $      90,000 ©
                       ‘Renewal of revetment wall at O-Boats Gympie Tce, Emergent renewal works                          ‘Expense = $         -    $    225,000  $    225,000.
                       Noosaville                                                                                        |
                       ‘BBQ renewals along Gympie Terrace                Emergent renewal works                          Expense     $        -    $     18,525  $     18,525
 Parks & Playgrounds                                                                                                                 $    261,008                $    788,525
Total
 Pathways & Enabling | Noosa Heads Main Beach Boardwalk Sails Link renewal Design costs. Project deferred to 2018/19 budget to Expense $%     -    $     25,000  $     25,000
Facilities             Yr2of2                                            “ with private works adjacent to site August 2018.
CNN                     NN                                                 SSS.                             SSS SSS               as                  eo eee          eee     |
                       Noosa Heads Park Road Boardwalk Renewal           Budget reduced to reflect timing of delivery (2018 Expense  $  6,993,573 -$  5,524,193  $   1,469,380
                       ‘Construction                                     ‘calendar year commencement)
                       Pedestrian Bridge renewal at Alec Loveday Park,   Emergent renewal works                          Expense     $        -    $     22,000  $     22,000
                       ‘Tewantin
                          ne                                                                                                                      fj}
                       Boardwalk renewal at Gympie Tce, Noosaville       ‘Emergent renewal works                         Expense     $        -    $     31,000  $     31,000
                       ‘Pathway renewal at Elm St, Cooroy (train to school) § Emergent renewal works                     [eave      /$        -   |$     13,000  $     13,000
                      ft                                                                                                                                         eee sj}
                        oo     renewal at David Low Way -Castaways Beach Ce        renewal works                         Expense     $        -  |$      20,000  $     20,000
                      Pathway renewal at Goodwin Street-Tewantin       ~ Emergent renewal works                          Expense    $         -  |$     24000 $        24,000.
 He                                                                                                                                  Rp ____i
                       Pathway renewal at Pacific Av - Sunshine Beach -  Emergent renewal works                          Expense     $        -    $      9,000  $      9,000
                       ‘Hotmix path to be removed and replaced with concrete
                       |
wa                      i                                                                                                                        TOTO"
                     Pathway
5	1	1	1	29	2	823	1324	110	24	96	renewal
5	1	1	1	29	3	945	1325	27	23	96	at
5	1	1	1	29	4	982	1323	109	32	96	Gympie
5	1	1	1	29	5	1101	1323	112	25	96	Terrace
5	1	1	1	29	6	1500	1323	148	32	52	Emergent
5	1	1	1	29	7	1659	1323	110	25	95	renewal
5	1	1	1	29	8	1779	1324	84	24	96	works
5	1	1	1	29	9	2293	1323	124	32	86	Expense
5	1	1	1	29	10	2477	1323	16	27	71	$
5	1	1	1	29	11	2628	1337	10	4	91	-
5	1	1	1	29	12	2691	1323	35	29	83	|$
5	1	1	1	29	13	2808	1323	98	29	77	93,883
5	1	1	1	29	14	2941	1323	17	28	76	$
5	1	1	1	29	15	3041	1323	98	30	86	93,883
5	1	1	1	29	16	3155	1327	2	23	0	-
4	1	1	1	30	0	318	1355	2839	14	-1	
5	1	1	1	30	1	886	1348	43	25	35	nnn
5	1	1	1	30	2	928	1355	2229	14	31	nnd
4	1	1	1	31	0	683	1369	2455	32	-1	
5	1	1	1	31	1	683	1370	130	31	58	‘Pathway
5	1	1	1	31	2	823	1370	110	24	95	renewal
5	1	1	1	31	3	945	1371	27	23	96	at
5	1	1	1	31	4	981	1370	94	25	95	James
5	1	1	1	31	5	1086	1369	36	30	95	St,
5	1	1	1	31	6	1136	1370	146	24	95	Noosaville
5	1	1	1	31	7	1501	1370	147	31	60	Emergent
5	1	1	1	31	8	1659	1370	110	24	96	renewal
5	1	1	1	31	9	1779	1370	84	24	95	works
5	1	1	1	31	10	2285	1370	132	31	29	‘Expense
5	1	1	1	31	11	2459	1369	34	28	29	$
5	1	1	1	31	12	2628	1383	10	4	92	-
5	1	1	1	31	13	2709	1369	17	28	93	$
5	1	1	1	31	14	2808	1370	98	29	93	25,000
5	1	1	1	31	15	2941	1369	17	28	90	$
5	1	1	1	31	16	3041	1370	97	29	96	25,000
4	1	1	1	32	0	325	1415	2814	33	-1	
5	1	1	1	32	1	325	1416	148	32	93	Pathways
5	1	1	1	32	2	483	1416	23	25	93	&
5	1	1	1	32	3	517	1416	134	32	96	Enabling
5	1	1	1	32	4	2476	1415	18	29	92	$
5	1	1	1	32	5	2530	1416	144	30	96	6,993,573
5	1	1	1	32	6	2941	1415	17	30	91	$
5	1	1	1	32	7	2997	1416	142	30	92	1,732,263
4	1	1	1	33	0	325	1458	223	26	-1	
5	1	1	1	33	1	325	1458	137	26	96	Facilities
5	1	1	1	33	2	472	1458	76	26	96	Total
4	1	1	1	34	0	325	1545	2813	32	-1	
5	1	1	1	34	1	325	1546	124	31	96	Planning
5	1	1	1	34	2	460	1545	118	26	96	Scheme
5	1	1	1	34	3	690	1545	44	26	96	Six
5	1	1	1	34	4	744	1546	57	24	96	Mile
5	1	1	1	34	5	811	1545	85	26	96	Creek
5	1	1	1	34	6	908	1546	78	24	96	Flood
5	1	1	1	34	7	997	1545	82	32	96	Study
5	1	1	1	34	8	1500	1546	108	31	40	‘Project
5	1	1	1	34	9	1618	1546	148	31	96	completed
5	1	1	1	34	10	1778	1546	82	24	96	under
5	1	1	1	34	11	1870	1546	105	31	96	budget.
5	1	1	1	34	12	2293	1546	124	31	86	Expense
5	1	1	1	34	13	2477	1545	16	28	58	$
5	1	1	1	34	14	2560	1546	113	29	88	116,063
5	1	1	1	34	15	2698	1545	28	28	88	-$
5	1	1	1	34	16	2807	1546	99	28	85	45,683
5	1	1	1	34	17	2941	1545	17	28	85	$
5	1	1	1	34	18	3041	1546	97	29	96	70,380
4	1	1	1	35	0	325	1593	2814	33	-1	
5	1	1	1	35	1	325	1594	135	32	96	Planning
5	1	1	1	35	2	470	1594	124	26	96	Scheme
5	1	1	1	35	3	2476	1593	18	30	90	$
5	1	1	1	35	4	2559	1594	114	31	79	116,063
5	1	1	1	35	5	2698	1593	28	30	80	-$
5	1	1	1	35	6	2807	1594	100	31	88	45,683
5	1	1	1	35	7	2941	1593	17	30	90	$
5	1	1	1	35	8	3040	1594	99	31	67	70,380
4	1	1	1	36	0	324	1637	76	25	-1	
5	1	1	1	36	1	324	1637	76	25	96	Total
4	1	1	1	37	0	325	1679	2813	32	-1	
5	1	1	1	37	1	325	1679	98	26	96	Sealed
5	1	1	1	37	2	436	1680	90	25	96	Roads
5	1	1	1	37	3	538	1680	116	25	88	Network
5	1	1	1	37	4	683	1680	84	29	88	Black
5	1	1	1	37	5	779	1680	130	25	96	Mountain
5	1	1	1	37	6	921	1680	75	25	96	Road
5	1	1	1	37	7	1008	1680	99	31	96	Priority
5	1	1	1	37	8	1117	1679	123	26	96	Sections
5	1	1	1	37	9	1251	1680	75	25	96	Road
5	1	1	1	37	10	1501	1680	99	25	67	Works
5	1	1	1	37	11	1610	1681	27	24	96	to
5	1	1	1	37	12	1647	1686	158	19	96	commence
5	1	1	1	37	13	1815	1680	63	25	92	later
5	1	1	1	37	14	1888	1680	23	25	96	in
5	1	1	1	37	15	1921	1680	118	25	96	financial
5	1	1	1	37	16	2050	1686	62	25	96	year
5	1	1	1	37	17	2293	1680	124	31	83	Expense
5	1	1	1	37	18	2470	1675	11	41	44	§$
5	1	1	1	37	19	2558	1680	115	29	92	510,000
5	1	1	1	37	20	2698	1679	28	28	92	-$
5	1	1	1	37	21	2790	1680	115	29	88	265,000
5	1	1	1	37	22	2941	1679	17	28	88	$
5	1	1	1	37	23	3022	1680	116	29	95	245,000
4	1	1	1	38	0	683	1700	819	59	-1	
5	1	1	1	38	1	683	1717	221	42	43	Reconstruction
5	1	1	1	38	2	1501	1700	1	55	92	|
4	1	1	1	39	0	683	1762	2455	53	-1	
5	1	1	1	39	1	683	1767	162	29	59	‘Noosaville,
5	1	1	1	39	2	856	1767	104	25	96	William
5	1	1	1	39	3	972	1766	86	26	96	Street
5	1	1	1	39	4	1068	1766	102	26	95	Shared
5	1	1	1	39	5	1181	1767	73	25	95	Zone
5	1	1	1	39	6	1265	1767	125	31	96	Footpath
5	1	1	1	39	7	1501	1767	147	31	55	‘Emergent
5	1	1	1	39	8	1657	1767	84	25	96	works
5	1	1	1	39	9	2287	1762	130	41	50	Expense
5	1	1	1	39	10	2451	1766	42	49	6	\$
5	1	1	1	39	11	2628	1781	71	33	34	=k
5	1	1	1	39	12	2709	1766	17	28	92	$
5	1	1	1	39	13	2826	1767	79	29	92	6,000
5	1	1	1	39	14	2941	1766	17	28	91	$
5	1	1	1	39	15	3058	1767	80	29	95	6,000
4	1	1	1	40	0	318	1799	2839	16	-1	
5	1	1	1	40	1	318	1777	469	42	10	emma
5	1	1	1	40	2	800	1804	342	3	21	ema
5	1	1	1	40	3	1189	1805	133	1	22	em
5	1	1	1	40	4	1490	1799	19	16	21	A
5	1	1	1	40	5	1521	1804	169	3	25	a
5	1	1	1	40	6	2309	1804	297	3	11	nop
5	1	1	1	40	7	2704	1804	196	3	19	RN
5	1	1	1	40	8	2883	1777	42	42	12	ee
5	1	1	1	40	9	2937	1800	220	7	20	NLT
4	1	1	1	41	0	689	1812	2449	32	-1	
5	1	1	1	41	1	689	1813	130	25	92	Tewantin
5	1	1	1	41	2	831	1813	80	31	92	Diyan
5	1	1	1	41	3	922	1813	86	26	96	Street
5	1	1	1	41	4	1018	1813	64	25	96	New
5	1	1	1	41	5	1092	1813	125	31	96	Footpath
5	1	1	1	41	6	1500	1813	159	26	41	Reallocate
5	1	1	1	41	7	1669	1813	95	31	96	design
5	1	1	1	41	8	1774	1814	75	24	96	costs
5	1	1	1	41	9	2293	1813	124	31	81	Expense
5	1	1	1	41	10	2477	1812	16	28	56	$
5	1	1	1	41	11	2576	1813	97	29	92	90,000
5	1	1	1	41	12	2691	1812	35	28	92	$
5	1	1	1	41	13	2810	1813	96	29	91	11,300
5	1	1	1	41	14	2941	1812	17	28	90	$
5	1	1	1	41	15	3025	1813	113	29	96	101,300
4	1	1	1	42	0	324	1902	76	25	-1	
5	1	1	1	42	1	324	1902	76	25	96	Total
4	1	1	1	43	0	325	1929	2832	49	-1	
5	1	1	1	43	1	325	1945	165	26	96	Stormwater
5	1	1	1	43	2	501	1945	129	32	90	Drainage
5	1	1	1	43	3	659	1941	21	41	21	§
5	1	1	1	43	4	690	1945	168	26	54	Cootharaba
5	1	1	1	43	5	869	1945	125	25	92	Kinmond
5	1	1	1	43	6	1006	1945	38	26	96	Ck
5	1	1	1	43	7	1055	1945	75	25	96	Road
5	1	1	1	43	8	1141	1945	117	26	96	Culverts
5	1	1	1	43	9	1509	1937	67	33	96	Prior
5	1	1	1	43	10	1585	1945	133	31	93	approved
5	1	1	1	43	11	1729	1945	105	32	96	funding
5	1	1	1	43	12	1847	1947	43	23	96	not
5	1	1	1	43	13	1901	1945	118	25	96	included
5	1	1	1	43	14	2030	1945	22	25	92	in
5	1	1	1	43	15	2064	1945	57	25	84	BR1
5	1	1	1	43	16	2293	1945	124	31	44	Expense
5	1	1	1	43	17	2459	1944	34	34	51	$
5	1	1	1	43	18	2628	1959	10	4	76	-
5	1	1	1	43	19	2709	1944	17	28	91	$
5	1	1	1	43	20	2763	1945	142	29	92	2,005,000
5	1	1	1	43	21	2941	1944	17	28	92	$
5	1	1	1	43	22	2995	1945	143	29	96	2,005,000
5	1	1	1	43	23	3148	1929	9	15	83	]
4	1	1	1	44	0	318	1983	2839	12	-1	
5	1	1	1	44	1	1514	1989	763	2	0	TT.
5	1	1	1	44	2	2934	1985	223	9	0	—$$—____—___—_
4	1	1	1	45	0	683	1997	2474	32	-1	
5	1	1	1	45	1	683	1998	99	26	55	Noosa
5	1	1	1	45	2	793	1998	99	29	96	Heads,
5	1	1	1	45	3	905	1998	82	24	94	Leslie
5	1	1	1	45	4	999	1998	73	24	96	Drive
5	1	1	1	45	5	1083	1997	164	26	92	Stormwater
5	1	1	1	45	6	1258	1998	138	24	92	Manholes
5	1	1	1	45	7	1509	1998	139	31	96	Emergent
5	1	1	1	45	8	1657	1998	84	24	96	works
5	1	1	1	45	9	2293	1998	124	31	86	Expense
5	1	1	1	45	10	2477	1997	16	28	44	$
5	1	1	1	45	11	2628	2011	10	5	92	-
5	1	1	1	45	12	2709	1997	17	28	88	$
5	1	1	1	45	13	2807	1998	99	29	93	40,000
5	1	1	1	45	14	2941	1997	17	28	92	$
5	1	1	1	45	15	3040	1998	98	29	70	40,000
4	1	1	1	46	0	665	2035	2492	82	-1	
5	1	1	1	46	1	665	2041	172	34	32	Noosaville

                                 Thomas Street & Gympie Tce Culverts     eo costs due to latent conditions encountered Expense $              -   |$    174,950 $     174,950.
                                                                         onsite.
                       Six Mile Creek Catchment Flood Monitoring System  [Faeieet completed under budget.                e           $    257,545 -$     32,000  $    225,545 |
 pt                                                                                                                                               nnd eeaaeneneneneneenemmmnsneneemnnemel
                       ‘Sunrise Beach, Orient Drive Drainage Slip        ‘Emergent works                                 ‘Expense = $         -    $    355,000  $    355,000.
                                                                                                                                                                    Page 32 of 45
Log in to download the original file

2017-11-16 Ordinary Meeting Agenda(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.