Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2017-11-16 Ordinary Meeting Agenda

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 33 of 45

eye                  Project Description                               IPC mei g                                      aay        erica cg        PX       lis     Proposed
                                                                                                                                                                         TTT l toi
                       Comesdrevelomec sent                                eee
                          Drainage works for renewal of kerb, channel and pits at Emergent renewal works                   Expense                  $     78,120  $     78,120
                          Renewal of catchpit tops at Sunshine Beach       Emergent renewal works                          Expense § $         -    |$   111,000  $    111,000
                          Renewal of various stormwater structures across the § Emergent renewal works                     Expense    $        -    $    140,500  $    140,500
                          shire
                          Drainage renewal works at Weyba Rd, Noosaville   Emergent renewal works                          Expense | $         -    |$    68,000  $     68,000
 fae
    Total
    Infrastructure        Roundabout resurfacing
    Management
                          Improvements                                     2016/17)
                          Tewantin Poinciana Moorindil St Roundabout +     Reduced scope to include Werin St to MoorindiiSt Expense   $    900,000 -$    157,064  $    742,936
                          Poinciana Ave (Werin to Sidoni)                  works only, Sidoni St to Moorindil St deferred to
                                                                           2018/19
                         Comncionteatyonge                                                ee                                meme Fee ee                                  ee
                          Whole of Shire Forward Planning & Design -       Reflects design team vacancies                  Expense    $    300,000 -$    150,000  $    150,000
                       Siac                                er                    renee                                     Sass              ars aan
                          Whole of Shire Traffic Study Priority 1 Construction Works to commence later in financial year   Expense    $    966,611 -$    666,611  $    300,000

    Transport and                                                                                                                     $  2,202,664 -§    462,194
    Infrastructure
    Management Total
  Grand Total                                                                                                                        $14,218,844 $2,409,775 $ 11,808,711

     ee) ae lia)          Project Description                               eee aU meg                                     BAT        eT ieee site 4 ie PX    tsiis    Proposed
                                                                                                                                                                          TT Teltaig
                        ee ggremeeeentinees PY                                                                                                         ee
   Bridges                Mary River Road Bridge, Cooroy                   New grant from the Federal Government Bridge    Revenue                  -$   260,000 -$    260,000
                                                                           Renewal Program to be received in 2017/18 and
                         ee Eagaitenciematnarnone PP
                          Old Noosa Road Bridge, Cooran                    New grant from the Federal Government Bridge    Revenue                  -$   200,000 -$    200,000
                                                                           Renewal Program to be received in 2017/18 and
  Bridges Total                                                                                                                                         480,000 -§    460,000
    Coastal Canals and = Seahaven Rock Wall                                Recognition of $9k contribution from Seavhaven  Revenue                  -$     9,000 -$      9,000
                                                                           boardwalk.
wewmete                | PE CU
    Waterways Total
    Community Facilities | Noosaville Library Refurbishment                New grant from the Local Government Grants and  Revenue                  -$   242,000 -$    242,000
                                                                           Subsidies Program of $800k to be received in
                                                                           2017/18 and 2018/19.
 we                   |
    Total
                                                                                                                                                                         Page 33 of 45
Log in to download the original file

2017-11-16 Ordinary Meeting Agenda(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.