ATTACHMENT 3
Page 35 of 45
Noosa Shire Council
2017/18 Capital Budget Review 2 ATTACHMENT 3
For the period ending 30 June
Program Description Grants Ciel Loans Levy Reserves Other General Rates Council Funds Total Project
Funds Reserves
Capital Works YL) : $ 250,000 $ 1,482,031 $ 5,036,378 $ 13,350,279 $ 20,118,688 $ 24,344,661
“Bridges Shire Annual Bridge Renewal/Rehabiltafon |
ary River Road Bridge, Coomoy s—<“—*~*~‘—*~*~*~—sSSC“‘i OO C—<“—~*~s~s~sSSOSCSCCCTCTTC“‘(qCOHN!#OCAMASSCSS SC BHO SOT 350
old Noosa Road Bridge, Coon s—<“<*~‘s*~*~‘—‘—‘—s~*~*~*~*~*~s~é~sSSSCi‘ SSC“‘CCSCON”#O#(NNNCO#*;#;‘*SS:*«COC«é#AOO)SS*~*~CSSSCSC*«O AOD $2540
—reaia Court Overpass, Sunrise Beach s—<—SsSS~“‘“‘“‘ SSNS; COO SS™SC*SSSCSC« BOOS «83,600
— Weyba Creek Bridge deck joints —“—~s~sSS~“‘“‘CS*s*sSS~“*‘C;‘“‘“S:™”CSC‘(UT CS OOOO SCSCS~*~*SSSCSC*«OD S$ ~~, 000
Bridges Toth 80,000 289,850 289,350 749,350 |
“Coastal Canals and Waterways Noosaville Noosa Waters Lock & WeirAnnualRenewal Program GS —“—sSSHSSC“‘ i‘
oo Tewantin Boat Ramp Access Upgrade 184,000} $154,000 $154,000
Noosa North Shore SrdCuttingBeachAccessSs—SSSC“‘=‘“‘;*;s*‘sS™~”~”:CSSC‘i OCS 88D $23,500
Coastal Canals and Waterways Toth 1500177 500 177,500
| commercial Land & Property leo $ 706,092 $ 1,862,643 $ 1,862,643 $ 2,568,735
cotton ne | 1g rosea, |g teases |s = senses s28705
— Peregian Beach, Rufous StGiWorks ss OSS—~—OCCOC CSS SSCS S«85O,BOB. S$ 550,803
CommercialLand & Property Total 0692 218,586 2,413,536 8,119,628
“Community Faciities _—=—=—=—=NoosaHeads The Jrenewal of AVsystemYear20f3 ss SSSC~—CsSCSSSCCSCSCSCSS «8000 $30,000 $ 30,000
~~ Peregian Beach Public Amenities-Design Year? SO SC~<“—~sSS~“=‘“*s‘sS™~™~SSSC‘CSC#C#CSS’~~C#86,000$ 35,000 $ 35,000
Noosaville Library Refurbishment 22,000 8 AT 871127 | $1,113,127
Corey tibrary,Repairsto Sip Lighting ssSC“‘CS;é*™S*SSSOOCOCO!OCOCOOOO™OC~CSCCSC‘(SNC#*d*S;C*«@3AOASS SCO S30
Respite Centre Carport and Internal Automatic Doors 8,000 $81,000 $31,000
Respite Centre Rehabiitation Works SOC—~—SSSC( SSCs «GOODS —«120,000 $120,000
Community Facilities Total 420001, 085,171 65,000 1,150,171 1,392,171
Corporate Buildings SS Doonelia House-Emergent works 80,000 $60,000 $B
SS Tewaintin Administration Building AirHandling Unitreplacement | )SSC~=<“—~*~sS*~‘“~*~*~*sé—‘SCS™~™~SCSSSC*«OLOOD S| ~—~=C«S_ODD S| ~—=«=iODD S| ~—=—= ODD
—Tewantin Administration Buiding-masterplan SSC~—SSSCSC“‘(SNSCOCSCNCONC#(#NNNSNNN S$ 100,000'$ 100,000 $ 100,000
Noosa Depot Workshop ElectrcalReplacement SS ss—‘sSS~‘“‘(C;*S*é*sSS*~*~‘“‘“CS*sSS*~‘Cs~‘—~SSC‘“‘CSCS™S”™”CS CS 203
Noosaville Depot -Replacement of ductedairconsystem SS SsC—<“—~s~s—sSS™SSSCSCSC‘C‘“‘;*sCSN’C‘#SOWWOTV.:G SST S «AOSD
Corporate Buildings Total 40,179 195,000 154,821 154,821
cnvelrcediewok cont ome g ||| groom '§ 250000 $ 250000
Hinterland - Priority Safety upgrade of Gravel road Sections - Design and
Sire GravelResheeting-AnnualProgram s—<~s*SSSC“‘CPSC?;SC;*;W!U SBE | $300,000 $ 362,485 $ 362,485
Gravel Road Network Total 82485 550,000 612,485 612,485
__Holiday Parks Noosaville Noosa River Holiday Park Small amenities Renewal S$ $800,000 $ 800,000 $ 800,000
Noosa North Shore Beachfront Campground Redevelopment S$ SS SS~*~<~SSSC*«HOIOSs—C“‘<;sé*‘CSC#*CSS:«O#«‘GSOOS ~©=—- +S ~—«260,800 $ 260,500
Holiday Parks Total 250,000 10,500 800,000 1,060,500 1,060,500
“Parks & Playgrounds _—=—=—=—=S=—(Cooran Pioneer Park upgrade - Design &Construction = s—CSSSC“‘“‘;*™*SCC*#*#C¥§NN;«SC«#NOO;OQO.|-$ 100,000 $ 100,000
ake Macdonald Botanic Gardens MasterPlanSSOS—SSC“‘“SS~SSCSCSC‘“CS™*SSCNSCSCNCCS ~~ 10,000/$ 10,000 $ 10,000
Pomona Stan Topper Park Bollardinstalation —SCSSC“‘(CSNCOC;#;*#;#*S#COC*#*”*C*SC‘(SNC#SSSC*«dSOOO”|'$~—~—=5D.OOD $ —~35,000 $ 35,000
Noosa Hinteriand Priority Playground -Planning& Design) sC~—“—~sSS~“~*~Cs*‘“‘S*sSS™S™~”CSSC‘a AZ 184 (18,4
Sunshine Beach, Skate Park Refurbishment SsC~‘“~sSSC“‘“‘(CSSC#®SNC#C#C#N#C#CSSCSC«UOO,358/$ 200,000 $ 400,358 $ 400,358
Noosaville, Gympie Terrace Park FumitureRenewals SS SsC“‘—s~sS™S™~™SSCSC“‘(S*~*~‘SC#*‘i@‘«OODSCSC*C“‘CNSN’S#C#SNYC#C*#«#S;«OOOSS «SSC
Noosaville, Pelican Beach Retaining Wal SSC—SSC“‘“CS™S*C*SCOC(C(NNNN(NNNNNNNNNNN NS 20,000 SS ~—~—=«220,000 $20,000
acarandaParkTewantn —SSSC“‘“S*S*S*SSSC~C<‘“‘“‘(CS*S™SSCSSSSSSSSSCS 88D SS ~—«8,000 S$ ~—90,000
OO SeahavenRockWal —i—‘“‘*~*~*~*~*~””””CSSC‘éC‘OSWSCO”*”™C™*™*SCOC~C~C“CSC”C™SCOC‘SN’#C#*‘#S,SG SSCS SSG $A8,55O_
Renewal of revetment wail at O-Boats Gympie Toe, Noosavile SsSSC~<“~*~*~‘“‘~‘“‘CS™S™S™SCSCSSSC HOODS ~S« 5000 $225,000
Bia renewals along Gympie Terrace s—<—SS~‘“‘C*s*sS~“‘:;‘S;*sSS~“‘Cs*s‘s*s*és‘s;S™S™~™~™~™S~S™SCSSSSCSC*« SSS BSS (1852S
Parks & Playgrounds Toth 8000 596,875 360,000 956,875 965,875
__Pathways & Enabling Facilities _——_ Noosa Heads Park Road Boardwalk Renewal 5,524,193 | $ 6,500,000 $ 975,807 F 975,807
Noosaville Wallace Park PathwaysRenewas COCSCSCSSC“CsSSSSCSS™S™~™~iSCSC‘(‘CSCC#SS«#480,000'$ 180,000 $ 180,000
Noosa Heads Main Beach Boardwak Construction =
Page 35 of 45See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.