Original source · versioned page text
2017-11-16 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 36 of 45
Program Description Grants er Loans Levy Reserves Other General Rates Council Funds Total Project
Funds Reserves
Whole of Shire - Noosa Pedestrian and Cycle DataCountes S$ 868338 C888) $86,833 $73,666
Noosa Heads Noosa Parade Road Corridor Upgrade-Design Ss —iCS*‘“‘“‘C;S;C!OCO;COC™*™*C“‘“‘“‘(SNSNCNCNCON#CWNWCSNC(‘C($NNNCSSNCM03,659)—SS~*~C~«~S*SSC*«* BH $103,659
Noosa Heads, Park Road Boardwalk Construction s—<‘—s™S~s~sSSSSCSC“‘SOSSSC*SCOC;*;*;*;*~*~*~*~*~*~*sSSSC*«GSWS3|SSC«S~C«93,573| $ 493,573
Botanic GardenShade House —SSSSC OOO 189438 | 1893 18.983
_ Blakesiey Street Footpath Upgrade Staget —“‘“C;s*‘“‘“‘“‘Cs*SSSSOOSOOOOCSCOCOUU SOTO} SSS S«10,B00 | $ 10,300
Botanic Gardens Pathway Replacement OOOO TS 88D 8 8OT
Noosa Heads Main Beach Boardwalk Sails Link renewal ¥r20f2 00 85000 $25,000 | $ 25,000
Pedestrian Bridge renewal at Alec Loveday Park, Tewantn ss si<“‘—~*s~sS™~s~—‘s‘sSSC‘CSOCSC;*sSSO#*éOOOYSCS*~<“‘«é‘*CS:SC*«i | $22,000
— Boaartwaik renewal at Gympie Tce, Noosavile sCCi‘“‘S*™S*SSOSO™O™C™C™C™COCOSC“‘“CSNSC‘CSSNOC“C(N#(NNNNNNNSSNNSCSCSC#34,000)—~—<“C*~SSS~SC*«S | $31,000
Pathway renewal at Eim St, Cooroy(traintoschool) SsS—=~—SSC“‘CS} SOC SS 8,000)—SS~*~C~‘“*~SSS:~SC~*«R«*O| S$ ~~«*13,OOD
Pathway renewal at David Low Way -CastawaysBeachSCsC~‘“—~*S*™*~sSSC“‘“‘(‘“SSNSC#CNC#CNC#N#C#C#CSSSSC«OOOD|S~SSS SSC, S| -—~20,000
Pathway renewal at Goodwin Street-Tewantin, 4000 $24,000 | $24,000
Pathway renewal at Pacific Av-SunshineBeachSSOSC—SSSC OCS OOD} 8000 «8,000
Pathway renewal at Gympie Terrace s—sSSC“‘“S™S™SSOCOCOC™~™~C~C~C~CSSC“‘(SNCNNSNNCCSC*CSCSNNSC*‘éS3BG |S 88S (83.883
Pathway renewal at James St,Noosavile —s—si—“—s~‘“‘“‘“‘“‘“‘“‘S;S.SCSC~<CS~S*é<;SSOCOCO MS OOS~S~=~SSCSCSC« | $25,000
Pathways &Enabling Facilities Total 88H 4,501,676 6,680,000 2,178,324 2,215,158
__ Public Transport Infrastructure ___—__| Shire Bus Shelter Disabled Compliant Program: Year4 $800,000) OP $300,000 $ 300,000 $ 600,000
Public Transport Infrastructure Total 800000 300,000 300,000 600,000
__Sealed Roads Network Shire reseal& rehabilitation program $1,016,757 | $1,452,779 | $2,489,536 | $ 2,469,536 _
Black Mountain - Black Mountain Road Priority sections CS SC—~—SSSC“‘CSNSCCOOCCCCCCCS 45,000) $ 200,000 $ 245,000 $ 245,000
nov savie, Lake Weyba Drive BusTumaround C—O OCSCSCSSSBTCAT | S187 $137,647
—Weyba Road Corridorimprovements s—i‘“‘;*~*sSSSOCSSOTts—<“<~*~s*s~‘—sSSCS~‘“‘;*~*~sSSC«KO221 | $1,000,000 | $ 592,779 | $ 1,700,000
Black Mountain tandsip tg t88 ft 88 8 215,188
Noosaville, Wiliam StreetSharedZone——ss—“‘—s‘“—s*s‘“‘“‘S*™S*™SSOOS™OOC™SCOOOOOOCOC™C‘CSCOOD SCC $000
Sealed Roads Network Total 0220 1,013,371 2,652,779 3,666,150 4,773,371
“Sports Ground and Facilities ___Girraween Sports Complex - condition assessment prirtyworks S$ C—‘iSSSSC“‘ KS C8BOO S$ 8.0 $53,500
Read Park Carpark Drainage —OC OC OOD —C~CSSCSC«*OD'F $12,000
Sports Ground and Facilities Total 12,000 53,500 65,500 85,500
“Stormwater Drainage == Noosaville Thomas StGympie Terrace Culvert Replacement Ci (i‘;*;*sésSS*~*~‘CS*é*sSS:SCOC«édTA,«S) SST 4,950| $ 174,950
Shiite Priority 1 Bioretentionrenewal ss OSSSCs~“CSSSC 80,000 $8,000 $80,000
Whole of Shire- Stormwater Structures —sOS~“‘“CS*‘“‘SSNOCSC*;‘(‘“SOSSC*~*~é‘rSSSC*C“‘iSTSC“«‘S:~C«GI | $9,619
OO eootharaba kinmond Ck Road Culverts s—i“‘~*‘“~*sSSSCié‘iTS —~—<“C~sSsSSC~“‘;*™*~*~*SSC«*dS«B NSB] SSS*SS «1,815,673 $ 2,005,000
Noosa Heads, Leslie Drive Stormwater Manholes isCS*~“‘“CS*S*sSSC“‘CSSC#SNSC#C(N(C(NNNNNSSCQOGD} SSS AD.000 $——40,000
Sunrise Beach, Orient Drive Drainage Sip, ss—i‘S~sSsSC“‘SNNNNNOOC#C(#(N’NS(NNNNNNNNNNY LS 355,000) —=<“‘«*~‘«‘~SS:~SC«C OO | $355,000
OO irainage renewalCoates Dr& DeJounge Ct, Boreen Pt SC‘“~*~‘“‘“s~“s*CS*s*™~™~S™S~S™SSSCSC“‘“CS™*™*SSSCS*«BAZO 78120 $78,120
Renewal of catchpittopsatSunshineBeach ss ssSC(i‘~*™S*SsSS™S”™~™~™~™COCOCSC‘(‘(SNSCOC#*#*SSSNC*éAAA«#OVT} SSS SAN,000 | $ ‘111,000
Renewal of various stormwater structures acrossthe shire C—SSC“‘(‘(‘SNNCC#CNOC#N#O#SSSCOC*MOXSO}S~SSSSC«AOWSOD| $140,500
—irainage renewal works at Weyba Rd, Noosaville = sC—“‘~*s*s*sSS*~“~*‘C*s‘“‘“S*S*SSSCSC~<“~*;‘s‘“‘;SS~<~S~S~S~SsSSSS*«iO | SSC~SSS SSC S| ~———«BODD
Stormwater Drainage Total 898272 852,862 80,000 2,432,862 3,122,189
__Streetscapes and Road Corridors___|Whole of Shire, Street Lighting Program 20,000 $20,000} $ 20,000
Streetscapes and Road Corridors Total 20,000 20,000, 20,000
__ Transport and Infrastructure Management__Poinciana , Morrindil St + Poinciana Ave (Werin to Sidoni) 8 $442,936 $300,000 $742,936 | $ 742,936
grade sage Serene Sree s saa 000's s00000| $000 | $000,000
Shire Traffic Study Priority 1 Construction Hilton Tce & Ernest St Int
Shire Forward Pianning & Design Program S—~—SSC“‘CS™SCSC*SNCNOCOC#C(C#CNNNNNNNNNNNNNNNNW...._ $150,000} $ 300,000 $ 150,000 $ 150,000
Noosaville Eenie Ck Pathway Signage stage2 ss —(“‘é‘ RS*«tdOOO!!!FFFO™~COOTCTC‘“‘CNS;CO#*‘«wUSWOBOYSCSC*=“‘CS;#*CSS «~OCO«S«O3O|$ (82,430
Castaways Beach, David Low Way Safety and Corridorimprovements | SC—~—SCS~sSCSCSCSC“‘(‘CNNNCOC#C¥CN’COC*‘#éAOYAS;S| SSCS SSCA $0,495
—Tewantin, Hilton Terrace & Emest Streetintersection ss s—<—sSSC“‘“CSS™SC*SCOC;*;*;#;C;*;*;*SS:*~C*«éGOOZO|SSC«S~—C«CO,000 |-$ 500,000
OO Tewantin, Cooroy Noosa Road Improvements, Stage4 SS 00000-— sC—“~*~*~*sCS™~C~CCSSSTSC“‘i IO] SCS BIOS 14,690
Pomona, Station Road Car Parking and Safety Improvements 810,759 $810,759 | $310,759
Whole of Shire, Significant Local Roads Directional Signage, s—“‘;*sSS™”™”™”™”™C™SC‘(SNC#SSSCOC*‘éQOWCSM3«SS=C'“‘CON™;#*SCS:«O#«SO,3A3:/$ (39,343
ict Creek Road Signage Upgrade SSCS OO 8500 817,500
—Tewantin Cooroy Noosa Rd Traffic Management Construction == $413,000, s—<“‘*‘“‘~*sS*~*~*~*~*~*~*~C*C*C~SS:~SC*C«t GO| $ ~—«GOOODD.| $ _—737,000 | $ 1,150,000
—______cmnndind.ctsonRe, ton Too, Gympie Tee Rowndabouresracing $ _tso00| || ners) snares sma rs
Transport and Infrastructure Management
Total
Page 36 of 45See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.