NOOSA COUNCIL IDAS Development Application Decision Notice 4
20.2 The new sewer main shall be provided with connections to future dwelling on the adjoining
properties at 10 and 14 Park Road and written permission shall be obtained from the owners of
these properties if the new sewer main or any proposed sewer works are to be located within these
properties.
20.3 The sewer connection between the dwelling on this property (No 12 Park Road) and the new sewer
main shall be constructed of fusion welded polyethylene pipe with the excavated trench for the
pipeline being backfilled and stabilised immediately by the excavated materials from the site. The
depth of the excavation shall not exceed 500mm, with a maximum width of 300mm and be on an
alignment that ensures the damage to the existing vegetation and its root systems is kept to the
absolute minimum. All excavation and backfilling works shall be carried out by hand and be
supervised and certified by a geotechnical engineer.
20.3 The sewer connection and stormwater disposal shall be accommodated in a single trench to
minimise disturbance on the site.
20.4 A Development Permit for Operational Works shall be required and all submitted plans shall be
prepared by a Registered Professional Engineer Queensland and certified by a Geotechnical
Engineer in relation to the impact of the works on the stability of the sand dune slope.
Town Water Supply
21. The site shall be connected to Council’s existing town water supply in Allambi Rise and be constructed in
accordance with Council’s standards and requirements at no cost to Council. The new connection to the
water reticulation system shall extend within the easement to the property boundary line of 9 Allambi Rise
and be metered.
Geotechnical Issues/Construction
22. All construction works related to the proposed extension shall take into consideration the
recommendations and findings of earlier geotechnical reports by Morrison Geotechnic regarding this site.
A registered consulting geotechnical engineer shall supervise the excavation and the foundation works of
the proposed extension works and certifies the stability of the structure and the existing dwelling upon the
completion of the extension works. The excavation works shall only be carried out during dry weather
conditions and if there is a risk of sand movement occurring, all work shall be suspended until such steps
approved by the applicant’s Geotechnical engineer been taken to ensure that no further slippage will
result. The certification of the completed works by the geotechnical engineer shall be submitted to Council
to be placed on Council’s records.
23. The disposal of sand, soil or any materials created by the construction of the dwellings shall be removed
in accordance with the approved Construction Management Plan. Details of the method of this disposal
of materials are to be submitted to Council at the Building Application stage. Not more than one vehicle at
a particular time will be parked in Park Road and/or Hasting Street for the removal of, or the delivery of,
materials associated with the site and no such vehicle shall remain overnight. No materials are permitted
to be stored within the road reserve.
24. A Construction Management Plan detailing the method and process of construction shall be prepared
by the builder in consultation with the applicant’s consulting engineer (Whaley Consulting Engineers) and
presented to Council for approval prior to issuing Operational Works Permit.
25. A programme of works is to be submitted with any application for any Development Permit for Operational
Works detailing the construction schedule and proposed environmental protection measures, which
addresses stabilisation of disturbed areas and identifies any affected vegetation.
Where the program is changed for any reason whatsoever, a copy of the revised program shall be
submitted to Council’s Works Inspector within seven (7) days.
26. A Traffic Management Plan for the Construction of the Dwelling addressing access to the site, the locating
of equipment, carparking arrangements for workers on the site and any potential conflicts with local traffic
shall be submitted and approved by Council prior to Development Permit for Operational Works. This
report is to also address peak holiday periods with delivery of materials.
27. Prior to obtaining a Building Permit the builder shall submit written acknowledgment that building works
shall proceed in accordance with the 9 tonne load limit applicable to Park Road, unless varied by Council
and that all works will be carried out in accordance with the approved Construction Management Plan.
A o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23643 DA COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 53 KB (small file)
- File type
No other editions are linked here.