NOOSA COUNCIL IDAS Development Application Decision Notice                                                             5


28.       At the completion of construction the consulting geotechnical engineer will certify that all works were
          carried out in accordance with their recommendations and that all structures and the site are stable. A
          copy of this certification shall be submitted to Council to be placed on Council records.

29.       Existing Conditions Survey is to be carried out on adjoining buildings, structures and services prior to any
          construction works taking place on site. If distress already exists, a photographic survey shall be
          undertaken, the distress measured and a plan to monitor changes to distress shall be implemented. A
          copy of this report is to be submitted to Council within 5 business days of survey and prior to construction
          work proceeding.

30.       The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use
          of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating,
          earthmoving or demolition machinery or other similar construction techniques.
          Environment Management Plan

31.       An Environment Management Plan shall be prepared by the applicant’s consulting engineers (Whaley
          Consulting Engineers) in consultation with the builder and be made available for approval by Council prior
          to obtaining Operational Works Permit. The purpose of the plan is to safeguard the environmental
          integrity particularly the sand dune surface and the tree canopy. The plan shall also specify approximate
          time frame for completion of the construction works particularly in relation to length of time the tower crane
          will remain installed on site in this visually prominent location.
          Erosion and Sediment Control

32.       Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
          control measures such as silt fencing, straw bales, controlled gravel access to the site and controlled
          disposal of waste, as deemed necessary.
          In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
          to the Council for approval prior to obtaining a Development Permit for Operational Works.
          Contributions

33.       Coastal Major Road Network Contributions of an amount of $2,442 in accordance with Planning Schedule
          Policy PSP42 shall be payed by the applicant prior to issuing a Development Permit for Operational
          Works.

34.       Coastal Major Pathway Contributions of an amount of $238 in accordance with Planning Schedule Policy
          PSP41 shall be payed by the applicant prior to issuing a Development Permit for Operational Works.
          General

35.       Any damage caused to any public utility or roads caused by the construction of this development shall be
          repaired to Council’s standards and at no cost to Council.

36.       Any alteration of any public utility or other facilities necessitated by the development of the land or
          associated construction works external to the site shall be at no cost to Council.

37.       The transportation of all materials to and from the site shall be undertaken in a manner such that no
          particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
          be covered to prevent materials including dust being windblown from the vehicle.

Building

38.       A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
          with Council at completion of the work confirming compliance with the maximum building height above
          natural surface, required by the provisions of the Planning Scheme.

39.       The Geotechnical report submitted as part of your application has been appraised and approved subject
          to the following conditions:-

          39.1. There is to be no uncontrolled discharge of water onto the slope;




A o:\database\onestop\decision.doc

Used in these records

About this file

File size
53 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23643 DA COMPILED Decision Notice [As Published].pdf · 53 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.