Skip to the record
Search everything, all in one place.

Council archive · source document

23643 DA COMPILED Decision Notice [As Published] · 132003.221152.4

of 11

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                             6


          39.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it
                should be reinstated immediately after construction is completed;

          39.3. Additional load due to fill, construction equipment or stockpiled materials should not be located on
                the dune slope;

          39.4. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers,
                the use of vibrating installation techniques for sheet piling and other construction vibrations caused
                by excavating, earthmoving or demolition machinery or other similar construction techniques;

          39.5. All construction works on site shall generally accord with the Building Construction Reports
                prepared by Whaley Consulting Group dated December 2002 subject to amendments required by
                condition 22, and 12 March 2004, together with the Morrison Geotechnic reports dated 1/9/00,
                25/5/01 and 24/3/04, with further details of the proposed crane construction method submitted for
                approval with the application for Operational Works. Particular attention shall be paid to the advice
                contained in Section 6 of the Morrison Geotechnic report of 24/3/04 in the event of changed site or
                construction conditions.

          39.6. A condition survey is to be carried out of adjoining buildings, structures and services prior to any
                demolition works or construction works taking place on site. If distress already exists, a
                photographic survey shall be undertaken, the distress measured and a plan to monitor changes to
                distress shall be implemented. A copy of this report is to be submitted to Council within 5 business
                days of survey and prior to construction work proceeding;

          39.7. Copies of all inspection reports by engineers are to be submitted to Council within 5 business days
                of the inspection taking place;

          39.8. A RPEQ is to be engaged by the client to oversee the piling works and copies of all inspection
                reports are to be submitted to Council within 5 business days of the inspection taking place;

          39.9. The applicant’s Geotechnical engineer will be required to be on site for the whole of the time during
                any excavation. The construction of the whole of the foundations is to be supervised and directed
                on site by a consulting Geotechnical engineer. No work of any such kind relating to the
                foundations shall be carried out if he is not on the site and supervising and directing this work.
                Such works shall only be carried out during dry weather conditions and if there is a risk of sand
                movement occurring, all work shall be suspended until such steps, approved by the applicant’s
                Geotechnical engineer and the Council’s Building Surveyor, have been taken to ensure that no
                further slippage will result.

          39.10. The builder, landscaper and all workers associated with construction of the works shall, at all
                 times, comply with the directions of the consulting geotechnical engineer.

40.       There shall be no direct access from the dwelling to the pool. The pool shall be enclosed by an isolation
          fence complying with Section 12U of the Building Act.

41.       The proposed tandem carport is not to discharge water onto any adjoining property. All roof water is to be
          piped to the stormwater discharge system for the dwelling.

42.       Deleted.

43.       Prior to a Development Permit for Building Work being granted for the construction of the dwelling, the
          applicant shall provide Council with written indemnification against any future claims from the
          applicant/owner of Lot 54, his successors or assigns resulting from any future damage to the dwelling or
          other structures arising from their proximity to the trees that are required to be retained on the property as
          a condition of granting the MCU for this development.
Additional Condition (09/08/2006)

44.       The stormwater disposal and sewer connection shall be undertaken in accordance with the Arborist’s
          Advice Report prepared by John Mullholland & Associates and dated March 2006 and the following
          requirements:
          44.1.       The route for the service trench shall be a minimum of 1.5 metres clear of all trees and shrubs,
                      unless otherwise agreed to by the Manager, Land Use.




A o:\database\onestop\decision.doc

Used in these records

About this file

File size
53 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23643 DA COMPILED Decision Notice [As Published].pdf · 53 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.