Specific Outcomes Probable solutions Proposal
residents to overlook the private open
space areas of neighbouring properties.
515.2 Buildings and structures do not Complies
include roof top terraces. There are no roof top terraces proposed.
Flooding and drainage
016 Buildings and other works are 516.1 For new buildings or structures or Not Applicable
designed and sited to- additions of more than 50m2 gross floor The proposal does not constitute a new
a) provide flood free access to premises area to an existing building or structure, building or more than 50m2 extension at
and flood free habitable areas; floor levels for habitable rooms are not ground level.
b) allow only minor, short term and less than the specified minimum floor
infrequent flooding of non-habitable levels;
areas;
c) ensure carparking areas can be AND
adequately drained;
d) ensure drainage does not adversely 516.2 Where Council infrastructure is Complies
impact upon other premises; and available- The proposed development can achieve
e) ensure filling or excavation does not a) any drainage (from buildings and connection to all Council Infrastructure.
adversely impact upon other premises land) flows to that infrastructure; and The existing infrastructure has capacity
by- b) the infrastructure has the capacity to to cater for the additional loading from
i. causing ponding of water on the site accept any additional loading. the minor extension works.
or nearby land;
ii. increasing flooding, which adversely AND
affects the safety or use of any land
upstream and downstream; and 516.3For Residential Uses- Not Applicable
iii. adversely affecting the flow of water a) where slab on ground construction is No slab on ground residential
in any overland flow path. used, filling does not extend more than construction is proposed.
1m beyond the building footprint and
access to car parking areas, measured
from the outer walls of the building; or
b) the design consists of a suspended
floor construction;
AND
516.4 Car parking and maneuvering Complies
areas are constructed at a level that Car parking areas can be drained
permits the parking area to drain from without the need for mechanical
the site by gravity means, without the pumping.
need for mechanical pumping; or
516.5 Basements for residential uses Not Applicable
have flood immunity above the Q100 No basement proposed.
where alternative means to mechanical
pumping are used to achieve such
immunity; or
516.6 Basements for non-residential Not Applicable
uses have flood immunity above the No basement proposed.
Q100 that may be achieved by means of
mechanical pumping where the
mechanical feature is installed with
adequate holding tanks and an
alternative back up power source.
510ping sites and ridgelines
017Development on sloping sites- 517.1 Buildings and associated access Not Applicable
a) is responsive to the natural ways are not constructed on land with a The site is not a sloping site.
topography of the site and minimises cut slope greater than 1 in 4 (25%);
and fill;
b) does not visually dominate the hill AND
slope or interrupt the skyline;
c) is integrated with the natural site 517.2 Buildings are of split level design
characteristics including vegetation; and that step down the slope or have a
d) for Multiple housing, takes the suspended floor construction;
form of small separate buildings;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 Report/ Plans - MCU12/0047Related documentApplication case desk ↗
About this file
- File size
- 43.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.