Information Request 132008 176 05
Issue – Serenity Close Cul-de-sac Upgrades
Page 18 of TTM’s Traffic Engineering Report (22135916) dated 07 October 2022 details
design modifications of the existing cul-de-sac at the end of Serenity Close. The submitted
documentation does not contain sufficient information for Council to assess the proposed
Serenity Close cul-de-sac upgrade.
Information Required
23. Provide additional detail demonstrating the extent of the Serenity Close cul-de-sac
upgrade. The detail must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland) and include, but not be limited to:
a. Demonstrate the extent of cul-de-sac roadworks, including:
i. demonstrate the proposed services entrance generally complies with Noosa
Council’s standard drawing RS-051;
ii. provide a longitudinal section extending from the centreline of the road
formation about the Serenity Close cul-de-sac roundabout to the “Loading”
area;
iii. Demonstrate the expected service vehicles (SRV, MRV, LRV BCC and
VOLVO B12 BLE) will not scrape or bottom out while entering, manoeuvring
on site and exiting the proposed servicing/loading entrance.
b. Demonstrate how the additional stormwater runoff generated by the downslope
slope of the entrance will be controlled, treated and released.
c. Provide comment on the amount of additional catchment volume during up to, and
including, a 1% AEP event and if the downstream drainage system has sufficient
capacity to handle this increase.
Issue – Practicality and Functionality of the Coach
Engineering is concerned the use of the coach is impracticable. The functionality of the coach
manoeuvring is impracticable and is likely to adversely affect the existing road network
conditions.
Information Required
24. Provide additional detail demonstrating the coach is capable of manoeuvring through
the existing road network without adversely affecting the existing traffic conditions. The
detail must be prepared by a suitably qualified person (RPEQ – Registered Professional
Engineer of Queensland) and follow the below route:
a. Enter the Grant Street/Noosa Drive/Sunshine Beach Road roundabout via the west
(Noosa Drive) and south (Sunshine Beach Road);
b. Grant Street via the Grant Street/Noosa Drive/Sunshine Beach Road roundabout;
c. Banksia Avenue (north) via the Grant Street/Banksia Avenue roundabout;
d. Serenity Close via Banksia Avenue;
e. Proposed Coach parking bay via Serenity Close;
f. Manoeuvre using the cul-de-sac;
g. Banksia Avenue via Serenity Close;
h. Grant Street via the Grant Street/Banksia Avenue roundabout;
i. Noosa Drive (west) via the Grant Street/Noosa Drive/Sunshine Beach Road
roundabout; and
Page 7 of 11
Document Set ID: 22193361
Version: 3, Version Date: 02/12/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.