                                                 Officer:            Tara Norley
                                                 Direct Telephone:   07 53296414
                                                 Our Reference:      RAL23/0021 OPW23/0177
                                                 Your Reference:     0128/RALOPW/081123

6 December 2023


Pace Planning Pty Ltd
9 Panorama Ridge Rd
BUDERIM QLD 4556
[email protected]



Dear Applicant
                                   Information Request
                                      Planning Act 2016

I refer to your application and advise that Council requires further information to satisfactorily
assess the proposal.
1.    APPLICATION DETAILS

 Application No.               RAL23/0021 & OPW23/0177

 Proposal:                     •    Development Permit for Reconfiguring a Lot – 1 Lot into 3
                                    Lots (including Environmental Reserve)
                               •    Development Permit for Operational Works (Roadwork,
                                    Drainage Work, Landscaping, Stormwater & Earthworks)

 Street Address:               11c Church St Pomona Qld 4568

 Real Property Description:    Lot 4 SP 301620

 Planning Scheme:              Noosa Plan 2020 (25 September 2020)

2.    INFORMATION REQUIRED

The information requested is set out below:
Issue – Traffic Control Signage
Condition 20 of Attachment A of the P&E Court Appeal dated 28 September 2023 states:
“Suitable signage for traffic control must be provided at either side of the internal single lane
bridge. The signage must be clearly indicated on the plans submitted for operational works
approval.”
Information Required
1. Provide line marking & signage plans indicating the appropriate traffic control measures to
   be implemented in accordance with Condition 20.




ABN 97.969.214.121                                                                    PO Box 141
noosa.qld.gov.au                                                               Tewantin QLD 4565
[email protected]                                                               07 5329 6500
                                                                                             Page 1 of 4
Log in to download the original file

Information Request RAL23 0021.pdf · 171 KB (small file)

Full text of the other 3 pages

Page 2

Issue – Preliminary Construction Management Plan
Advisory Note 12 of Attachment A of the P&E Court Appeal dated 28 September 2023 states:
“Preparation of a Preliminary Construction Management Plan
12.   A preliminary Construction Management Plan must be submitted with the Operational
      Works application and must address the following:
      a.   Traffic management during all aspects of the construction phase including:
           i.     A Traffic Management Control Plan in accordance with the Manual of
                  Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                  and traffic control measures prior to construction
           ii.    Maintenance of safe vehicle and pedestrian access for the areas affected by
                  the works during and after daily construction has ceased
           iii.   Proposed fencing to the site during the construction phase of the
                  development
           iv.    Approval of the Traffic Management Control Plan by the Department of
                  Transport and Main Roads (DTMR) for any works on State controlled roads
           v.     Provision for worker car parking
      b.   Maintenance and protection of water quality and existing drainage lines through
           the construction site, through the implementation of appropriate erosion and
           sediment control measures
      c.   Works programme identifying key components of the works and their respective
           durations
      d.   Establishment of a communication protocol with the general public, adjoining
           owners, emergency services and local businesses to advise of agreed
           construction times, impacts on traffic, services and other relevant issues.
      e.   Include a post out to the local residents and businesses advising of the proposed
           development, the expected time frames and the site contact details.
      f.   Include signage in prominent locations on the boundaries of the site advising of
           the proposed development, the expected time frames and the site contact details.
      g.   Identification of complaint management procedures including:
           i.     Contact details for the on-site manager
           ii.    Dispute resolution procedures
      h.   Details on the location of external fill/dump sites/sources, the haulage route, type
           of vehicle to be utilised during filling operations and frequency of usage. NB any
           damage to the existing road system as a result of haulage operations shall be fully
           repaired at the applicant’s expense
      i.   It is acknowledged that the preliminary Construction Management Plan will be a
           draft document requiring finalisation upon appointment of the Principal Contractor
           employed to construct the works and a final document will be required to be
           submitted at the Pre-Start Meeting for the project.”
Information Required
2. Provide a preliminary Construction Management Plan in accordance with Advisory Note
   12 and in accordance with the Noosa Plan 2020.


Issue –Table Drain Conveyance
It is unclear how stormwater flows from the existing table drain along Church Street will be
conveyed southwards along the development frontage as shown on the proposed External
Roadworks Layout Plan (Drawing 184-001-800 Rev A, Dated 25.10.23) at CH 70.00m.




                                                                                       Page 2 of 4

Page 3

Information Required
3. Provide a piped inlet into the proposed gully pit (Structure 1-5) in accordance with Revision
   D of External Roadworks Layout Plan 184-001-800 as referenced in Condition 18 of
   Attachment A of the P&E Court Appeal.


Issue – Retaining Wall Detail
Council requires additional detail of the three retaining wall types proposed across the site to
assess the application.
Information Required
4. Provide amended earthworks drawings including the cross-sectional typical details of each
   wall type proposed including the extent of subsoil drainage required and any additional
   construction notes.

   Note that all retaining walls that are publicly accessible and exceed 1.0m in height must
   be fitted with a commercial grade safety fence in accordance with Condition 36 of
   Attachment A of the P&E Court Appeal.


Issue – Filter Media Area
Table 11 of the Hydraulic Impact Assessment approved as part of Condition 2 of the P&E
Court Appeal nominates a combined filter area of 53m2 for the bioretention basins. The
submitted Plans only include 50m2 of filter area.
Information Required
5. Provide amended plans demonstrating that the recommended filter media area of 53m2
   can be accommodated in accordance with the approved Hydraulic Impact Assessment.

   Or alternatively,

   Provide an amended report with supporting modelling demonstrating that the reduced area
   is acceptable.


Issue – Bio Basin Access & Maintenance
Council has concerns with the maintenance and access locations for the proposed bio
retention basins given the steep batters proposed. Water by Design – Bioretention Technical
Design Guidelines (2014) recommends a limiting width of 10 meters from the access point
and bio basin perimeter when construction and maintenance access is available from one
side. The distance from the end of the shared driveway to the far perimeter of Bio Basin 1 is
approximately 16m.
Information Required
6. Provide amended plans nominating the access point for each bioretention basin and
   demonstrate that the minimum access and maintenance requirements of Water by Design
   – Bioretention Technical Design Guidelines (2014) can be achieved.


Issue – Open Drain Access & Maintenance
It is unclear how drainage easements A, B, C & D are able to be accessed internally within
the site for maintenance purposes given the extensive earthworks and associated retaining
walls proposed.



                                                                                        Page 3 of 4

Page 4

Information Required
7. Nominate suitable access points for the open drains contained within easements A, B, C
   & D and include amended plans showing the required access treatments (e.g. stairs, paths
   and gates etc.).
3.    DUE DATE FOR RESPONSE TO INFORMATION REQUEST

The due date for providing the requested information is 6 March 2023. Email your response
to [email protected]. Please advise Council of your response to this information request
in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4.    OTHER DETAILS

You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.
Yours faithfully


Tara Norley
Senior Development Planner




                                                                                       Page 4 of 4

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.