Council archive · source document
Request to extend relevant period 132003.221199.3
Very large file (37.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
~ ..
~
~ INNOVATIVE
PLANNING
~ SOLUTIONS
In addition to the mandatory information enclosed with this application, we request that
Council take into account the following facts and circumstances in their assessment of this
extension request:
IReasons for Re uest to Extend Relevant Period :J
1. The MCU development approval issued on 6 March 2006 following a long and
complicated assessment process which resulted in a State ministerial call in to decide
the application. This approval process occurred well before the current landowner (and
applicants) ownership of the land.
2. Unfortunately, after obtaining this development approval the GFC (of 2007-2008) and
subsequent slump in property markets forced the then landowner into receivership. It
was as a consequence of this forced sale that the current land owner (and applicant for
this extension application) purchased the land.
3. Therefore, the current landowner’s interest in the property and its related
redevelopment entitlements / opportunities has been for a relatively short period of
time (2years, 11 months).
4. Since acquiring the land the landowner has been coming to terms with what is
undoubtedly a complex development approval with many associated and conditioned
obligations. This has included undertaking a review of the previous technical reporting
prepared as part of the development application process particularly Ecological
Assessments and Construction Viability reporting.
5. The owner has also been investigating the markets likely acceptance of the end product
that would be delivered by the current development approval and the viability of
proceeding with the development in this context (particularly given the financial
difficulties experienced by the developers of the adjoining Viridian Development).
6. The above actions have been undertaken to inform the applicant’s decision about
whether the approved development is the best outcome for the site or whether a
revised development concept should be explored either by way of changes (reduction
in density and related construction impacts / complexities) of the existing approval or
P: 07 5443 1444
E: [email protected]
Suite 5. 156-158 Alexandra Parade
Page 2 of6 Alexandra Headland Q 4572
PO Box 1043 Maroochydore Q 4558
townplanningsunshinecoast.com .au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to extend relevant period 132003.221199.3Related documentApplication case desk ↗
About this file
- File size
- 37.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.