Bounce Hostel - ELEVATION COMPARISON
CONSTRUCTION ISSUE
Aluminium decorative Rebated timber Steel posts to eng. Decorative aluminium Hardies Linea Rebated timber Rebated timber Selected Colorbond Aluminium
balustrade. Selected louvre design. Selected finish rafter tails weatherboard cladding louvre louvre roofing, fascia and batten fence
finish with selected paint finish gutters
MAX HEIGHT
RL 11.300 m
LEVEL 2 CEILING
RL 9.200 m
SIDE BOUNDARY
2950
9500 - Building Height
8350
SIDE BOUNDARY
LEVEL 2
RL 6.250 m
3300
GROUND FLOOR LEVEL
RL 2.950 m
DRIVEWAY TO BASEMENT CARPARK
N.G.L.
RL 1.800 m
Painted FC sheeting to gable end with feature timber decro battens Proposed street signage PWD access
ramp
PROPOSED SOUTH ELEVATION
STAGE 2
16 GIA APPLICATION 11/02/2021
15 UPDATED CONSTRUCTION SET 11/02/2021
14 CONSTRUCTION INFORMATION 29/01/2021
12 CHANGE APPLIACTION 15/12/2020
10 STAGE 2 - CONSTRUCTION DRAWINGS 14/07/2020
7 BUILDING APPROVAL 13/05/2020
5 UNITY WATER ISSUE 17/03/2020
3 BUILDING APPROVAL 11/12/2019
2 WINDOW & DOOR SCHEDULES 25/11/2019
Issue Description Date
Project
Client Name
STAGE 2 - BOUNCE NOOSA HOSTEL
Project Address
14-16 MARY STREET
NOOSAVILLE QLD 4566
Designer (s) Drawn by
ICB JM
Drawing Title
ELEVATIONS
APPROVED SOUTH ELEVATION
ZEST DESIGN STUDIO
P | 0457 314 346
A | 1A/12 Action St, Noosaville, QLD 4566
E | [email protected] ABN: 37 601 151 508
W | www.zestbuildingdesign.com.au Q.B.C.C Lic. No: 1307012
Project Number Sheet Number
18001 A.200
SCALE @A1
0 1m 2m 3m 4m 5m Phase Issue
1:100 C 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 3 pages
Page 2
CONSTRUCTION ISSUE
Steel posts to eng. Aluminium decorative Privacy screening Selected Colorbond Windows on upper level to achieve minimum acoustic Hardies Linea weatherboard
design. Selected finish balustrade. Selected roofing, fascia and gutters rating Rw32 as per MCU18/0102. Rooms to provided cladding with selected paint finish
finish with air conditioning/mechanical ventilation.
FFL. 10.777 m
3987
MAX HEIGHT
RL 11.300 m
FRONT BOUNDARY
REAR BOUNDARY
FFL. 9.592 m
LEVEL 2 CEILING
RL 9.200 m
W310
2950
W217 W216 W215 W214 W213 W212
8350
LEVEL 2
RL 6.250 m
4800 - O.M.P.
W304
3300
W211 W210 W209 W208 W207 W206 W205 W204 W203 W202 W201 W200
D102
W102
GROUND FLOOR LEVEL
RL 2.950 m
PROPOSED WEST ELEVATION
STAGE 2
16 GIA APPLICATION 11/02/2021
15 UPDATED CONSTRUCTION SET 11/02/2021
14 CONSTRUCTION INFORMATION 29/01/2021
12 CHANGE APPLIACTION 15/12/2020
10 STAGE 2 - CONSTRUCTION DRAW INGS 14/07/2020
7 BUILDING APPROVAL 13/05/2020
3 BUILDING APPROVAL 11/12/2019
2 WINDOW & DOOR SCHEDULES 25/11/2019
1 CONSTRUCTION ISSUE 04/11/2019
Issue Description Date
Project
Client Name
STAGE 2 - BOUNCE NOOSA HOSTEL
Project Address
14-16 MARY STREET
NOOSAVILLE QLD 4566
Designer (s) Drawn by
ICB JM
Drawing Title
ELEVATIONS
APPROVED WEST ELEVATION
ZEST DESIGN STUDIO
P | 0457 314 346
A | 1A/12 Action St, Noosaville, QLD 4566
E | [email protected] ABN: 37 601 151 508
W | www.zestbuildingdesign.com.au Q.B.C.C Lic. No: 1307012
Project Number Sheet Number
18001 A.201
SCALE @A1
0 1m 2m 3m 4m 5m Phase Issue
1:100
C 16
Page 3
CONSTRUCTION ISSUE
Windows on upper level to achieve minimum acoustic
Selected Colorbond roofing, rating Rw32 as per MCU18/0102. Rooms to provided Privacy screening Hardies Linea weatherboard Aluminium decorative Steel posts to eng.
fascia and gutters with air conditioning/mechanical ventilation. cladding with selected paint finish balustrade. Selected design. Selected finish
finish
3987
FFL. 10.777 m
MAX HEIGHT
RL 11.300 m
REAR BOUNDARY
FFL. 9.592 m
LEVEL 2 CEILING
RL 9.200 m
W311
2950
W411 W410 W409 W408 W407 W406 W405 W404 W403 W402
8350
8830 - Building Height
LEVEL 2
RL 6.250 m
W305
FRONT BOUNDARY
W412
3300
D402
GROUND FLOOR LEVEL
RL 2.950 m
N.G.L.
RL 1.800 m
PROPOSED EAST ELEVATION
STAGE 2
16 GIA APPLICATION 11/02/2021
14 CONSTRUCTION INFORMATION 29/01/2021
5 UNITY WATER ISSUE 17/03/2020
B Information Request 31/07/2018
Issue Description Date
Project
Client Name
STAGE 2 - BOUNCE NOOSA HOSTEL
Project Address
14-16 MARY STREET
NOOSAVILLE QLD 4566
Designer (s) Drawn by
Designer Author
Drawing Title
ELEVATIONS
APPROVED EAST ELEVATION
ZEST DESIGN STUDIO
P | 0457 314 346
A | 1A/12 Action St, Noosaville, QLD 4566
E | [email protected] ABN: 37 601 151 508
W | www.zestbuildingdesign.com.au Q.B.C.C Lic. No: 1307012
Project Number Sheet Number
N 18001 A.202
N
SCALE @A1
0 0.5m 1m 2m Phase Issue
1:50
C 16
Page 4
Windows on upper level to achieve minimum acoustic
CONSTRUCTION ISSUE
rating Rw32 as per MCU18/0102. Rooms to provided
with air conditioning/mechanical ventilation.
Timber louvre screen Selected Colorbond roofing, Hardies Linea weatherboard Privacy screen Painted Concrete Wall - Hardies Linea weatherboard Timber louvre screen
fascia and gutters cladding with selected paint finish Monument cladding with selected paint finish
MAX HEIGHT
RL 11.300 m
LEVEL 2 CEILING
RL 9.200 m
2950
SIDE BOUNDARY
W306 W307 W308 W309
8350
SIDE BOUNDARY
LEVEL 2
RL 6.250 m
3300
W300 W301 W302 W303
GROUND FLOOR LEVEL
RL 2.950 m
PROPOSED NORTH ELEVATION
STAGE 2
16 GIA APPLICATION 11/02/2021
14 CONSTRUCTION INFORMATION 29/01/2021
B Information Request 31/07/2018
Issue Description Date
Project
Client Name
STAGE 2 - BOUNCE NOOSA HOSTEL
Project Address
14-16 MARY STREET
NOOSAVILLE QLD 4566
Designer (s) Drawn by
Designer Author
Drawing Title
ELEVATIONS
APPROVED WEST ELEVATION
ZEST DESIGN STUDIO
P | 0457 314 346
A | 1A/12 Action St, Noosaville, QLD 4566
E | [email protected] ABN: 37 601 151 508
W | www.zestbuildingdesign.com.au Q.B.C.C Lic. No: 1307012
Project Number Sheet Number
N 18001 A.203
N
SCALE @A1
0 0.5m 1m 2m Phase Issue
1:50
C 16