Original source · versioned page text
Bounce Hostel - ELEVATION COMPARISON
CONSTRUCTION ISSUE
Steel posts to eng. Aluminium decorative Privacy screening Selected Colorbond Windows on upper level to achieve minimum acoustic Hardies Linea weatherboard
design. Selected finish balustrade. Selected roofing, fascia and gutters rating Rw32 as per MCU18/0102. Rooms to provided cladding with selected paint finish
finish with air conditioning/mechanical ventilation.
FFL. 10.777 m
3987
MAX HEIGHT
RL 11.300 m
FRONT BOUNDARY
REAR BOUNDARY
FFL. 9.592 m
LEVEL 2 CEILING
RL 9.200 m
W310
2950
W217 W216 W215 W214 W213 W212
8350
LEVEL 2
RL 6.250 m
4800 - O.M.P.
W304
3300
W211 W210 W209 W208 W207 W206 W205 W204 W203 W202 W201 W200
D102
W102
GROUND FLOOR LEVEL
RL 2.950 m
PROPOSED WEST ELEVATION
STAGE 2
16 GIA APPLICATION 11/02/2021
15 UPDATED CONSTRUCTION SET 11/02/2021
14 CONSTRUCTION INFORMATION 29/01/2021
12 CHANGE APPLIACTION 15/12/2020
10 STAGE 2 - CONSTRUCTION DRAW INGS 14/07/2020
7 BUILDING APPROVAL 13/05/2020
3 BUILDING APPROVAL 11/12/2019
2 WINDOW & DOOR SCHEDULES 25/11/2019
1 CONSTRUCTION ISSUE 04/11/2019
Issue Description Date
Project
Client Name
STAGE 2 - BOUNCE NOOSA HOSTEL
Project Address
14-16 MARY STREET
NOOSAVILLE QLD 4566
Designer (s) Drawn by
ICB JM
Drawing Title
ELEVATIONS
APPROVED WEST ELEVATION
ZEST DESIGN STUDIO
P | 0457 314 346
A | 1A/12 Action St, Noosaville, QLD 4566
E | [email protected] ABN: 37 601 151 508
W | www.zestbuildingdesign.com.au Q.B.C.C Lic. No: 1307012
Project Number Sheet Number
18001 A.201
SCALE @A1
0 1m 2m 3m 4m 5m Phase Issue
1:100
C 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.