Original source · versioned page text
Bounce Hostel - ELEVATION COMPARISON
Windows on upper level to achieve minimum acoustic
CONSTRUCTION ISSUE
rating Rw32 as per MCU18/0102. Rooms to provided
with air conditioning/mechanical ventilation.
Timber louvre screen Selected Colorbond roofing, Hardies Linea weatherboard Privacy screen Painted Concrete Wall - Hardies Linea weatherboard Timber louvre screen
fascia and gutters cladding with selected paint finish Monument cladding with selected paint finish
MAX HEIGHT
RL 11.300 m
LEVEL 2 CEILING
RL 9.200 m
2950
SIDE BOUNDARY
W306 W307 W308 W309
8350
SIDE BOUNDARY
LEVEL 2
RL 6.250 m
3300
W300 W301 W302 W303
GROUND FLOOR LEVEL
RL 2.950 m
PROPOSED NORTH ELEVATION
STAGE 2
16 GIA APPLICATION 11/02/2021
14 CONSTRUCTION INFORMATION 29/01/2021
B Information Request 31/07/2018
Issue Description Date
Project
Client Name
STAGE 2 - BOUNCE NOOSA HOSTEL
Project Address
14-16 MARY STREET
NOOSAVILLE QLD 4566
Designer (s) Drawn by
Designer Author
Drawing Title
ELEVATIONS
APPROVED WEST ELEVATION
ZEST DESIGN STUDIO
P | 0457 314 346
A | 1A/12 Action St, Noosaville, QLD 4566
E | [email protected] ABN: 37 601 151 508
W | www.zestbuildingdesign.com.au Q.B.C.C Lic. No: 1307012
Project Number Sheet Number
N 18001 A.203
N
SCALE @A1
0 0.5m 1m 2m Phase Issue
1:50
C 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.