Bounce Hostel - ELEVATION COMPARISON
CONSTRUCTION ISSUE
Windows on upper level to achieve minimum acoustic
Selected Colorbond roofing, rating Rw32 as per MCU18/0102. Rooms to provided Privacy screening Hardies Linea weatherboard Aluminium decorative Steel posts to eng.
fascia and gutters with air conditioning/mechanical ventilation. cladding with selected paint finish balustrade. Selected design. Selected finish
finish
3987
FFL. 10.777 m
MAX HEIGHT
RL 11.300 m
REAR BOUNDARY
FFL. 9.592 m
LEVEL 2 CEILING
RL 9.200 m
W311
2950
W411 W410 W409 W408 W407 W406 W405 W404 W403 W402
8350
8830 - Building Height
LEVEL 2
RL 6.250 m
W305
FRONT BOUNDARY
W412
3300
D402
GROUND FLOOR LEVEL
RL 2.950 m
N.G.L.
RL 1.800 m
PROPOSED EAST ELEVATION
STAGE 2
16 GIA APPLICATION 11/02/2021
14 CONSTRUCTION INFORMATION 29/01/2021
5 UNITY WATER ISSUE 17/03/2020
B Information Request 31/07/2018
Issue Description Date
Project
Client Name
STAGE 2 - BOUNCE NOOSA HOSTEL
Project Address
14-16 MARY STREET
NOOSAVILLE QLD 4566
Designer (s) Drawn by
Designer Author
Drawing Title
ELEVATIONS
APPROVED EAST ELEVATION
ZEST DESIGN STUDIO
P | 0457 314 346
A | 1A/12 Action St, Noosaville, QLD 4566
E | [email protected] ABN: 37 601 151 508
W | www.zestbuildingdesign.com.au Q.B.C.C Lic. No: 1307012
Project Number Sheet Number
N 18001 A.202
N
SCALE @A1
0 0.5m 1m 2m Phase Issue
1:50
C 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.